My WebLink
|
Help
|
About
|
Sign Out
ORD 1880
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:08 PM
Creation date
6/10/2003 11:25:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/20/2003
DOCUMENT NO
ORD 1880
DOCUMENT NAME
GENERATOR
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ The photovoltaic facilities shall not create adverse glare that <br /> distracts motorists. <br />d. If photovoitaic panels are proposed, the panels (includinR visible <br /> trim caps and returns) shall be black, clear, blue, gray or the <br /> same color as the roof on which th~. are mounted. <br />e. l. f photovoltaic shingles are proposed, the shingles shall comply <br /> with any roof color regulations.for the subject properO/. <br /> <br />If the installation ora photovoltaic.facili.tv creates glare that distracts <br />motorists qfter it has been installed, at the discretion ~f the Zoning <br />Administrator, the photovoltaic facility mag be sub[ect to design review <br />even ~f the facility was exempt from design review prior to its installation. <br />If necessarB the Zoning Administrator maF add conditions of approval to <br />mitigate the glare impact, which may include, but is not limited to, <br />moving the photovoltaic facility. <br /> <br />18.20.040 Procedures: <br /> <br />B. An applicant for a project requiring design review by the Zoning <br /> Administrator shall submit a site plan and/or architectural drawings or <br /> sketches showing building elevations and/or details of the structure, or <br /> other such plans, reports or data as may be required by the Zoning <br /> Administrator to evaluate each project. <br /> <br />For that class of project described in Subsection 18.20.010B13 o. f this <br />Chapter, the Zoning Administrator shall send notice of the application <br />to surrounding property owners within 1, O00 feet of the pro/ect site. If <br />within seven (7) days o. f mailing such notice, the Zoning <br />Administrator receives a request.for a hearing, the Zoning <br />Administrator shall schedule an administrative hearing within the <br /> <br />timeframe established by law.for decision making on pro/ects. Either <br />administratively, ~f no hearing is requested, or after the administrative <br />hearing, the Zoning Administrator shah approve, conditionally <br />approve, or disapprove the application in accordance with the <br />purposes o. f this Chapter. <br /> <br />{Renumber Section 18.20.040 as necessary} <br /> <br /> Page 6 <br />Draft Ordinance for Case PRZ-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.