Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br /> <br /> Recommended <br />CIP # Amendments Adjusted <br /> Qtr 2 Budget <br />015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 0 50,000 <br />015033 Stonerid~e Drive Roadway Landseapin~ 0 58,137 <br />ol5o41 Tri-Valley Transportation Fees (Reserve) (312,418) 411.340 <br />015055 Nei[hborhood Traffic Calmin~ Devices (31.310) 0 <br />o~ 5o07 I580/El Charro lnterchan[~e Stud~' 0 94,700 <br />Ol5O6S Street Li[~htin[ Upgrades 0 44.545 <br />015070 Vineyard Corridor Improvements (2,187) 23,268 <br />017037 General Trail Improvements (moved to Parks CIP) (29,105) 0 <br />o25003 Annual Resurfacin~ of Various City Streets 1,834,610 1,834,610 <br />025004 Annual Slur~ Sealin~ of Various City Streets 120,000 120,000 <br />o25o05 Sidewalks and Handicap Ramps Installations 7.000 87.000 <br />025007 Annual Traffic Buttons and Line Markers Installation 130,325 130,325 <br />025o09 Curb and Gutter Replacements for Street Resurfaein~ Projects 96,760 96,760 <br />o25ol4 Vineyard Corridor Infrastructure Improvements Phase I (1,839.528 7,160,472 <br />025015 Sunol Blvd at 1-680 South Bound OffRamp: Install New Traffic Signal (201,646) 668,354 <br />025016 Sunol Blvd Reconstruction (or Widening): Junipero to 1-680 Phase 1 293.773 413.773 <br />025018 Bernal at Vineyard: Install New Traffic Signal (147.910) 2,090 <br />025019 Foothill at Muirwood Dr. South: Street Ali~nmentNew Traffic Signal 0 300.000 <br /> Vineyard Corridor Infrastructure Improvements Phase 1 - Joint City PUSD Escrow <br />025022 Fund (2,000~000 0 <br />o25o23 Dou[~herty Valley Miti[~ation Project (Reserve) 0 50,000 <br />025030 Foothill Road Improvements, South of Oak Creek Drive 0 50,000 <br />025039 Traffic Signal at Pleasanton Ave and Bemal 15,000 15,000 <br />025040 Traffic Si[~nal at West Las Positas and Dorman 15,000 15,000 <br />025041 Traffic Signal at Vineyard and Montevino 150,000 150,000 <br />025055 Neighborhood Traffic Calmin~ Devices 43,649 93,649 <br />025071 First & Kottin~er Under[~roundin[~ for Street Lights and Laterals 0 50,000 <br />80o014 Stonerid[~e Dr Specific Plan Study 31,570 60,905 <br />8o5o08 Si[~nal - Main ~ Vervais - Reimburse Developer 0 203 <br />805014 Right of Way Transfer to Caltrans (NPlD3) 132,265 132,265 <br />895021 Bemal Brid~e Paintin[~ (434,562] 0 <br />935028 Arroyo Del Valle Bike Path 0 0 <br />935030 Extension of Livin[ston Way 0 12,000 <br />935045 Removal of Old Bernal Brid~e Foundations 72,040 200,289 <br />955029 First St Brid~e at Arroyo Del Valle; Interim Improve (1STEA~IBRR) 0 49,283 <br />965o2~ Brid[~e Paintin[~ (1996-97) 0 45,000 <br />965022 Hopyard Rd Resurfacin[[; Stonerid[e Dr Arroyo Mocho (1996-97) (23,437', 0 <br />966001 Stonerid[~e Drive at Santa Rita Improvements -(NP1D #1 ) (364,500~ 630 <br /> <br /> 975038 Owens Drive Improvements - Phase 1 . 0 51,487 <br /> 975039 Santa Rita at Valley Intersection Improvements (NPID#1) 364,500 1,246,048 <br /> 975062 Owens Drive Improvements - Phase Il 0 25,534 <br /> 985013 Storm Draina[~e Improvements on Foothill Rd South of Bemal Ave 0 62,400 <br /> 985Ol6 Dublin Canyon Road Widcnin[~ 0 1,465,867 <br /> 985033 Street Li[~ht - Pole Replaeemant Pro,am 0 130,000 <br /> 985090 Dublin Reimbursement for Future Projects 0 2,220,800 <br /> 995007 Annual Traffic Buttons and Line Markers Installation (20,324) 15,916 <br /> 995015 Santa Rita Road Resurfaein$: Old Santa Rita to Stonerid~e (78,222) 510,671 <br /> 995o~6 Implementation of PMS with GIS 0 19,250 <br /> <br /> <br />