My WebLink
|
Help
|
About
|
Sign Out
PC 052511
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2011
>
PC 052511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:14:47 PM
Creation date
7/18/2011 3:23:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/25/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
as the rest of Hacienda is also finishing up development, he could see where Kaiser <br />would be thinking of a garage, and other places would fill up and get more pedestrian. <br />He indicated that this probably is the essence to the start of a parking district, where if <br />more parking is available, and it becomes more pedestrian and no longer an end <br />station, more people will start to commute here to work coming from elsewhere, <br />resulting in more of that even AM and PM flow like the stations in Oakland and <br />Berkeley. <br /> <br />Commissioner Blank stated that he thinks this is more than just parking and trip <br />generation, although those are part of the equation. He indicated that in preparation for <br />projected routing of BART and timeframes. He noted that while this may not happen <br />soon, he is certain it will happen at some point in the future. He inquired how <br />Pleasanton would anchor the things that are there when it is no longer the end of the <br />line and ensure that this extension is not a detriment to the community that the City is <br />trying to build. <br /> <br />Mr. Fleissig stated that the beauty of this system being discussed tonight is that the <br />circulation framework Mr. Williams identified really works like a skeleton. He noted that <br />while it is not certain how it will be built upon, the skeleton makes sense and allows for <br />phasing, different sizes of parcels, and different uses, with the mix-and-match options to <br />set the basic framework. He added that as people come forward, the site review can <br />come before Planning Commission, and a developer will describe how they have met <br />the guidelines. He indicated that he has worked with BART, and having the <br />expectations where the City has set out a vision before BART does its RFP is such a <br />big help of saying what the City wants. He stated that he believes that sometime in the <br />next five to ten years, this framework will still hold and it will probably be before the <br />extension takes place. <br /> <br />Mr. Fleissig stated that because this is part of the zoning regulations, they have <br />translated all the guidelines and development scenarios to include everything the City <br />needs to have. He noted that the Planning Commission and City Council have <br />indicated that this site is the heart of the transit village, and, therefore, it is the place <br />where density ought to be. He indicated that if it can be demonstrated that a trip <br />reduction, with a parking study, with those particular users, and in that particular design, <br />could make sense, a beyond-the-base maximum of a FAR 1.0 might be allowed within <br />the framework as impacts have not increased, and there is the flexibility to allow for a <br />greater development. He noted that the different numbers are mathematically derived, <br />the height limit will be maintained as it currently is, with an exception for the hotel to <br />allow for the additional height or with the percentage, per specific site review. He added <br />that the TOD parking minimums reflect what has already been agreed to in terms of <br />residential live/work, visitor parking, and non-residential use with three spaces per <br />1,000 square feet of commercial space, and additional reductions if it can be <br />demonstrated. <br /> <br />THE PUBLIC HEARING WAS OPENED. <br />PLANNING COMMISSION MINUTES, May 25, 2011 Page 11 of 21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.