Laserfiche WebLink
PRZ-59/1623 Cindy Way <br /> be required. The City has adopted the most recent Regional Water Quality Control Board stormwater <br /> discharge requirements related to design, construction and implementation of the subject site. A <br /> design feature incorporating the BMP's is the provision of bio-swales used as on-site treatment prior <br /> to discharge into the storm water system. <br /> Therefore, this would be a Less-than-Significant Impact <br /> h.-c., g.-j.) The existing home is currently connected to the City's water system. The rezoning of the <br /> property and relocation of the existing home would not anticipate a loss of groundwater recharge <br /> potential. <br /> Site development associated with the home relocation will alter the existing drainage pattern from its <br /> existing condition. The construction of the future homes will not use groundwater. Any existing <br /> wells will be required to be abandoned pursuant to the Alameda County Department of <br /> Environmental Health. Additionally, the development of this project does not anticipate a loss of <br /> groundwater recharge potential. It will not alter the alignment or stability of the Arroyo Del Valle. <br /> The channel will not be subject :o substantial erosion or siltation. <br /> The Arroyo Del Valle is considered by Zone 7 as a downstream controlled release stormwater facility. <br /> The development will not expose people or structures to a significant risk of loss, injury or death <br /> involving flooding. <br /> The City of Pleasanton is not at risk from seiche, tsunami, or mudflow. <br /> Therefore, this would be a No]Impact. <br /> 10. LAND USE AND PLANNING <br /> Less Than <br /> Potentially Less Than No <br /> Significant with <br /> Significant Mitigation Significant Impact <br /> Impact Incorporation Impact <br /> Would the project: <br /> a)Physically divide an established community? X <br /> h) Conflict with any applicable land use plan,policy,or X <br /> regulation of an agency with jurisdiction over the <br /> project(including,but not limited to the general plan, <br /> specific plan,local coastal program,or zoning <br /> ordinance)adopted for the purpose of avoiding or <br /> mitigating an environmental effect? <br /> c) Conflict with any applicable habitat conservation X <br /> plan or natural community conservation plan? <br /> Environmental Setting <br /> The project site is located in the irbanized area of the City. <br /> Significance Criteria <br /> The impact questions above constitute the significance criteria for this environmental topic. <br /> 15 7/8/2011 <br />