My WebLink
|
Help
|
About
|
Sign Out
20
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
062111
>
20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2011 4:22:21 PM
Creation date
6/16/2011 4:22:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/21/2011
DESTRUCT DATE
15Y
DOCUMENT NO
20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The proposed budget is the City's comprehensive financial plan for all programs and <br /> services for the 2011/12FY and 2012/13FY. Staff is recommending that the Operating <br /> Budget be adopted as presented at the budget workshops on May 17 and June 7, 2011. <br /> DISCUSSION <br /> The Operating Budget maintains core service levels, and addresses all new program <br /> and project initiatives prioritized by the City Council. Careful planning and a diversified <br /> local economy have allowed us to balance the Operating Budget without reductions in <br /> services. <br /> Even with our impressive financial position compared to most municipalities, the City's <br /> budget for the next several years should be closely monitored to ensure that our <br /> operating position remains positive. The length and depth of the current economic <br /> recession and the extent to which revenues may rebound in future years is unknown. <br /> Additional takeaway of local revenues by the State in order to balance the State's <br /> budget is another unknown. <br /> There is also much to be optimistic about, for the City is well positioned to capitalize on <br /> the economy when it begins to improve. The City is moving forward with the <br /> development of the Pleasanton Gateway Project, Staples Ranch, and working with the <br /> Pleasanton Downtown Association and the Economic Vitality Committee to stimulate <br /> the resurgence of public and private development in the downtown area. <br /> How the City Is Meeting Its Budgetary Challenges <br /> The Operating Budget as presented is balanced. However, with the continued stress on <br /> the economy and the condition of the State's finances, it may become a challenge to <br /> keep the Operating Budget in balance during the next two years. Given that, the City <br /> will continue to maintain reserves of $25.3 million in the General Fund for unforeseen <br /> emergencies. These funds can be called upon if needed to keep the Operating Budget <br /> balanced. <br /> Overall, the Operating Budget includes the permanent elimination of 34 positions <br /> through attrition since July 1, 2009, resulting in a total cost savings of approximately <br /> $5.1 million. It also includes known and projected labor concessions totaling <br /> approximately $4.1 million and $3.5 million in reductions in non-personnel expenditures. <br /> In accordance with adopted fiscal policies the City has adequate reserves for <br /> replacement of equipment and renovation of facilities, self insured liability, workers <br /> compensation, and retiree medical costs. Over the next few years, the goal is to restore <br /> the annual contributions to these reserves to their pre-recession funding levels. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.