My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
062111
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2011 12:36:31 PM
Creation date
6/16/2011 4:07:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/21/2011
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY MEDICAL SERV YES -IHSI RESPONDER ADVANCED LIFE SUPPORT AGREEMENT (REV 1/17/11) <br /> c. Clinical Reports (e.g.: protocol compliance, cardiac arrest survival rate, intubation <br /> success rate, etc.) <br /> d. Other reports as requested by County with reasonable notice. <br /> 13.2 Other reports may be required less frequently than monthly, as determined by the EMS <br /> Director. <br /> 13.3. County shall provide notice to Contractor at least two (2) months in advance of any change <br /> to required reports, frequency, or due dates. <br /> 13.4 Response Time Performance: <br /> a. Response Time data, including reports received from Dispatch Center, shall be used by <br /> Contractor and County to evaluate Contractor's performance and compliance. . <br /> b. If Response Time compliance is below 90% for any calendar month, or longer period if <br /> required to accumulate 100 responses (see Section 5.1), Contractor shall identify the <br /> causes and shall document efforts to eliminate problems on an ongoing basis. <br /> c. Contractor shall submit a performance improvement plan with the Response Time <br /> performance report. The performance improvement plan shall identify each problem <br /> that contributed to a failure to meet Response Times and steps being taken to correct <br /> the problem. <br /> d. Response Time reporting and times shall be documented as set forth in this Agreement. <br /> 13.5 Compliance with Protocols <br /> a. Contractor shall report monthly on the overall compliance with EMS Policies and <br /> performance on all calls in a format provided by EMS. <br /> b. Data for compliance shall be submitted in aggregate and stratified by categories <br /> identified in the Quality Management Plan and approved by the EMS Director. <br /> 13.6 Quality Improvement <br /> a. Contractor shall develop a clear and concise set of processes and practices designed to <br /> identify and address opportunities for improvement. The description of these processes <br /> shall include the approach for achieving and maintaining measurable outcomes. <br /> b. Contractor shall provide reports that update progress on quality improvement projects <br /> as requested by the EMS Director. <br /> c. Contractor shall participate with the County's quality plan and follow all EMS policies <br /> regarding quality improvement and provide appropriate data. <br /> Page 11 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.