My WebLink
|
Help
|
About
|
Sign Out
ATTACHMENT 04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
051711
>
BUDGET WORKSHOP
>
ATTACHMENT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 5:45:05 PM
Creation date
5/12/2011 5:43:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2011
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. FIRE DEPARTMENT <br /> Explosives: 10k-100k lbs $850.00 <br /> Explosives: 100k-200k lbs $1,070.00 <br /> Explosives:200k+lbs $1,280.00 <br /> Flam/Comb Liq:Above Ground<55 gal $80.00 <br /> Flam/Comb Liq:Above Ground 55-225 gal $120.00 <br /> Flam/Comb Liq:Above Ground 225-1k gal $160.00 <br /> Flam/Comb Liq:Above Ground 1k-10k gal $200.00 <br /> Flam/Comb Liq:Above Ground 10k-20k gal $240.00 <br /> Flam/Comb Liq:Above Ground 20k+gal $330.00 <br /> Fruit Ripening $100.00 <br /> HazMat Abovegrnd: <55 gal $80.00 <br /> HazMat Abovegrnd:55-225 gal $100.00 <br /> HazMat Abovegrnd:225-1k gal $160.00 <br /> HazMat Abovegrnd: 1k-10k gal $200.00 <br /> HazMat Abovegrnd: 10k-20k gal $240.00 <br /> HazMat Abovegrnd:20k+gal $280.00 <br /> Haz Waste Generator:CESQG $110.00 <br /> Haz Waste Generator:Lrg Quantity $300.00 <br /> Haz Waste Generator:SQG $210.00 <br /> Haz Waste Treatment:CE only $460.00 <br /> Haz Waste Treatment:CA,PBR $600.00 <br /> Universal Waste Collection Site $570.00 <br /> High-Piled Combust Storage $280.00 <br /> Hot-Works Oper: <551 cu ft $160.00 <br /> Hot-Works Oper:551 -2,250 cu ft $190.00 <br /> Hot-Works Oper:2,251-10k cu ft $240.00 <br /> Hot-Works Oper: 10k-100k cu ft $320.00 <br /> Hot-Works Oper: 100k-200k cu ft $400.00 <br /> Hot-Works Oper:200k+cu ft $480.00 <br /> Liq Petroleum Gas:<226 gal $110.00 <br /> Liq Petroleum Gas:226-500 gal $130.00 <br /> Liq Petroleum Gas:501-2k gal $160.00 <br /> Liq Petroleum Gas:2k-4k gal $220.00 <br /> Liq Petroleum Gas:4-6k gal $270.00 <br /> Liq Petroleum Gas:6+k gal $330.00 <br /> Liq/Gas Vehicles in Assembly $190.00 <br /> Lumber Yard or Woodworking Plant $620.00 <br /> Magnesium $300.00 <br /> Mall,covered $1,410.00 <br /> Motor Vehicle Fuel Disp Station-no bulk $180.00 <br /> Ovens,Industrial $80.00 <br /> POA:A-2 $30.00 <br /> POA:A-1 $50.00 <br /> POA:A-3 $60.00 <br /> POA:A-4 $80.00 <br /> POA:A-5 $110.00 <br /> Pyrotech Spcl Effects Material $580.00 <br /> Refrigeration Equipment $150.00 <br /> Repair Garages $340.00 <br /> Rooftop Heliport $110.00 <br /> Spraying or Dipping $80.00 <br /> Tires-Rebuilding Plant $100.00 <br /> Tire-Storage of Scrap $100.00 <br /> UST- 1 tanks $530.00 <br /> UST-2 tanks $790.00 <br /> UST-3 tanks $1,310.00 <br /> UST-4 tanks $1,580.00 <br /> VI.Fire 10 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.