Laserfiche WebLink
Stoneridge Mall Road instead of open - graded asphalt concrete because of its current <br /> pavement condition. Sub -drain pipe (3,235 linear feet) was also installed within the limit <br /> of this roadway section. Damaged pavement totaling 80,100 square feet was repaired. <br /> Damaged concrete curb and gutter and sidewalk within the project limits was repaired. <br /> All non - compliant ADA access ramps have been upgraded. <br /> Budget <br /> Contract change orders totaled a net decrease of $27,807, resulting from a decrease in <br /> material quantities. <br /> The project was completed for a total cost of $1,046,072. This total project cost will be <br /> reimbursed by Caltrans. To date, the reimbursement amount of $305,116.78 has been <br /> received and another $629,808 has been submitted to Caltrans for reimbursement. <br /> Staff will prepare a Project Completion Expenditure Report to Caltrans for <br /> reimbursement for the remaining ARRA funding amount of $111,147.64. The final <br /> project funding and expenditures are summarized in Attachment 1 to this report. <br /> Submitteclby: Fiscal Review: ,� Approve by: <br /> 1� <br /> Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachment: <br /> 1. Summary of Project Funding and Expenditures <br /> Page 3 of 3 <br />