My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
041911
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2011 12:55:38 PM
Creation date
4/13/2011 12:22:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/19/2011
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> Council awarded the contract to the lowest responsible bidder, Grade Tec, Inc. on May <br /> 4, 2010. This project was designed to improve the sidewalk accessibility and overall <br /> street appearance for the new Firehouse Arts Center located on Railroad Avenue. The <br /> project as described below has since been completed and is ready for acceptance. <br /> DISCUSSION <br /> The project consisted of removing and replacing the sidewalk on the north side of <br /> Division Street between Main Street and Railroad Avenue to ensure adequate <br /> pedestrian access for persons with disabilities. New street trees were planted as the <br /> current ones restricted pedestrian access and were determined to be in poor health <br /> condition with numerous defects in structural stability. <br /> Other amenities included the installation of decorative street lights (similar to Main <br /> Street), and the installation of a redwood fence along portions of the south side of <br /> Division Street and Railroad Avenue. <br /> The curb returns at the intersection of Division Street and Railroad Avenue were <br /> improved to include pedestrian bulb -outs with concrete pavers (similar to Main Street). <br /> In addition, the newly placed asphalt concrete received a colored street imprint design <br /> with a grid pattern that matched the entrance to the Firehouse Arts Center. Immediately <br /> following construction of the subject project, Railroad Avenue, Division Street, and <br /> Spring Street received slurry seal applications and were re- striped. <br /> Budget <br /> Funding for this project was transferred from the Capital Improvement Program <br /> Reserve, CIP No. 068018, into the Division Street and Railroad Avenue Improvements <br /> project, CIP No. 098044. Council approved a total project budget of $284,375, of which <br /> $273,203 was spent. During construction, nine change orders were issued for a total <br /> amount of $13,861 due to unforeseen field conditions and the modification of the <br /> original plans which included additional asphalt curbing, roadway grading, and curb <br /> striping for the Firehouse Arts Center. Staff recommends that the unspent balance of <br /> $11,173 be transferred back into the Capital Improvement Program Reserve (see <br /> Attachment 2 for details of the project funding and expenditures). <br /> Submitted by: Fiscal Review: Approved by: <br /> 7 4 tfrA6 <br /> Brian Dolan Emily Wagner Ne son Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Vicinity Map <br /> 2. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.