My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
030111
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 2:46:15 PM
Creation date
2/24/2011 2:46:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2011
DESTRUCT DATE
15Y
DOCUMENT NO
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT AND MATERIALS CHARGES <br /> COST COST <br /> DESCRIPTION PER twin' UNIT COMMENTS DESCRIPTION PER UNIT UNIT COMMENTS <br /> IS) ( <br /> 1 2V/24V Water Sampling Pumps 100.00 day Multi - parameter Water Meter 10.00 hour <br /> 1850 W Generator 50.00 day Nuclear Density Gauge 15.00 hour <br /> 55- Gallon Drums 50.00 Each pit Meter 5.00 hour <br /> Air Content Meter 7.00 hour Photo Ionization Detector 125.00 day <br /> Air Sample Bags 15.00 each Pondpac 50.00 hour <br /> Air Sampling Pump 25.00 day Pressured Bailers with Filters 25.00 each <br /> All- Terrain Vehicle (Mule) 25.00 hour Puntp- Diaphragm Surface 12.00 hour <br /> Anchor Bolt Testing Device 15.00 hour 4 hr min R Meter (Pachometer) 12.00 hour 4 hr min <br /> Bailers (Disposable) 8.00 each Range Finder 3.00 hour <br /> Basecamp Software 25.00 Month _Reditlow Pump with Generator 200.00 day <br /> Brunton Transit 3.00 hour Resistivity Metet 10.00 hour <br /> Camera - Digital 10.00 hour Retaining Wall Software 15.00 hour <br /> Camera - Disposable 8.00 each Riprap Design 25.00 hour <br /> Camera - Underground 50.00 hour Sampling 'tithes 6.00 each <br /> Camera - Video 10.00 hour Sand Cone Equipment and Material 25.00 day <br /> Centrifugal Pump 75.00 day Scheduling Software 15.00 hour <br /> Civil Tech Shoring Suite 40.00 hour Schmidt I lammer 15.00 hour <br /> Concrete Bags - 50 lbs. 10.00 bag Seismic Analysis Software 40.00 hour <br /> Conductivity, pH & Temp. Monitor 50.00 day Seismograph 25.00 hour <br /> Conductivity -Based Water Level Indicator 8.00 hour Sitework Modeling Software 50.00 hour <br /> Coring - Concrete 85.00 hour Skidmore Wilhelm Bolt Tension Calib. 10.00 hour 8 hr min <br /> Coring Machine with Generator 37.00 hour 4 hr min Slope Indicator (Inclinometer) 40.00 hour <br /> Crack Monitor 20.00 each Sondex Instrument 35.00 hour <br /> DC Purge Pump 25.00 day Submersible Pump 100,00 day <br /> Diamond Bit Core Barrel -2" 5.00 1 /1000 in. 'technician equipment, vehicle and <br /> 19.00 hour <br /> Diamond Bit Core Barrel - 3" 6.00 1/1000 in wireless communication <br /> Diamond Bit Core Barrel - 4" 7.00 1 /1000 in. Technician vehicle and wireless 9.00 hour <br /> communication _ <br /> Diamond Bit Core Barrel - 6" 8.00 1 /1000 in Tcrramodel 15.00 hour <br /> Diamond Bit Core Barrel - 8" 11.00 1 /1000 in. Thermometer- Analog 3.00 hour <br /> Dissolved 0i Meter 8.00 hour Thermometer - Digital 6.00 hour <br /> Electronic Water Level Indicator 10,00 day Thin Lift Nuclear Asphalt Gauge 3450 16.00 hour <br /> Equipment'fransport(cr) 100.00 hour Torque Wrench 12.00 hour 4 hr min <br /> Exploration Equipment 50.00 hour Track- Mounted Carryall 14.00 hour <br /> EZFRISK 250.00 day Tramex Moisture Meter 6.00 hour <br /> Field Communication Equipment 3.00 hour Transfer Pump 25.00 day <br /> Floor Flatness "Tasting Device 16.00 hour Turbidity Meter 55.00 day <br /> Floor Level Equipment 1800 hour If 1' Equipment 22.00 hour <br /> Generator 100.00 day Vapor Emission Test Kit 25.00 kit <br /> Geoteehnical Analysis Software 40.00 hour Vector Conversion 60.00 conversion <br /> GPS Field Grade (Trimble GFO EXP3) 20.00 hour Water Distilled 5.00 bottle <br /> GPS I land held 25.00 day Well Development Tool 50.00 day <br /> GPS Mapping Grade (Trimble PRO XRS) 30.00 hour YSI Water Metet 75.00 day <br /> Trimble Survey Grade GPS 90.00 hour 4 hr min Bridge Toll actual actual <br /> Hand Auger and Soil Sampler 100.00 day Parking actual actual <br /> Hard Hat 12.00 each Mileage .75 mile <br /> I lealth Risk Calculations Software 40.00 hour Trailer 25.00 day <br /> I lydraulic Analysis Software 30.00 hour AutoCAD, Hardware and Software 17.00 hour <br /> Hydrocarbon Test Kit 40.00 each Facsimile 100 page <br /> Hydrogen Peroxide Test Kit 6.00 hour Notarized Lien Release 25.00 lien <br /> I lydrologic Analysis Software 15.00 hour Photocopies Black & White .25 each <br /> Ice 4.00 bag Photocopies Color 11 x 17 1.50 each <br /> Inclinometer 10.00 each Photocopies Color 872 x 11 .75 each <br /> Inclinometer Probe 125.00 day Plot - Black & White 3.00 square fool <br /> Level B Protection 263.00 day /person Plot - Color 3.85 square fool <br /> I.evel (2 Protection 168.00 day /person Postage actual actual <br /> Level D Protection 38.00 day /person Reproduction Equipment 50.00 hour <br /> Level D Protection (Modified) 28.00 day /person <br /> Scan - Black & White 1.50 each <br /> Magnetic Particle Equipment 8.00 hour <br /> Scan - Color 3.75 each <br /> Mason Jars 3.00 jar 'telephone .50 minute <br /> Methane Meter 200.00 day <br /> Moisture Content Testing Device 6.00 hour s <br /> 4-1-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.