My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
030111
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 2:46:15 PM
Creation date
2/24/2011 2:46:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2011
DESTRUCT DATE
15Y
DOCUMENT NO
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> Ei <br /> I N C O R P O R A T E D <br /> Pleasanton SS Lift Station S -6 Replacement Project No. P2010. 000.343 <br /> Special Inspection and Materials Testing Fee Estimate Details August 18, 2010 <br /> FIELD INSPECTIONS DAYS HRS /DAY HOURS RATE EXTENSION <br /> Soils Testing <br /> Subgrade /Import Material Sampling 2 3 6 $105 $630 <br /> Footings - Bearing Capacity Assessment 2 3 6 $112 $672 <br /> Underground Utilities 6 4 24 $112 $2,688 <br /> Subgrade and AB Testing 4 6 24 $112 $2,688 <br /> Construction Services Manager 14 0.5 7 $125 $875 <br /> Reinforcing Steel Placement <br /> Wet Well Footings /Slab 1 4 4 $105 $420 <br /> Wet Well Walls 3 5 15 $105 51.575 <br /> Wet Well Top Slab 1 4 4 $105 $420 <br /> Valve Vault Footings /Slab 1 4 4 $105 $420 <br /> Valve Vault Walls 2 5 10 $105 $1,050 <br /> Valve Vault Top Slab 1 4 4 $105 $420 <br /> MMC Building - Footings 1 4 4 $105 $420 <br /> AMC Building - .Slab 1 4 4 $105 $420 <br /> Miscellaneous - Meter Vault 1 4 4 $105 $420 <br /> Construction Services Manager 12 0.25 3 $125 $375 <br /> Concrete <br /> Wet Well Footings /Slab 1 6 6 $105 $630 <br /> Wet Well Walls 3 4 12 $105 $1,260 <br /> Wet Well Top Slab 1 6 6 $105 $630 <br /> Valve Vault Footings /Slab 1 6 6 $105 $630 <br /> Valve Vault Walls 2 4 8 $105 $840 <br /> Valve Vault Top Slab 1 6 6 $105 $630 <br /> MMC Building - Footings 1 4 4 $ 105 5420 <br /> MMC Building - Slab 1 6 6 $105 $630 <br /> Miscellaneous - Meter Vault 1 4 4 $105 $420 <br /> Cylinder Pick -ups 12 1 12 $93 $1,116 <br /> Construction Services ,Manager 12 0.25 3 $125 $375 <br /> Structural Masonry <br /> CMU ID and Sampling 1 2 2 $105 $210 <br /> ReinforcingSteel /Mortar 2 2 4 $105 $420 <br /> Grout Placement 3 4 12 $105 $1,260 <br /> Sample Pickup 5 1 5 $93 $465 <br /> Construction Services Manager 6 0.25 1.5 $125 $188 <br /> Epoxy -Set and Mechanical Anchors <br /> Installation Observations I 3 3 $ 105 $315 <br /> Construction Services Manager 1 0.25 0.25 $125 $31 <br /> TRIPS Miles/Trip Total Miles RATE EXTENSION <br /> Milea_'e .72 /mile 107 20 2140 $0.72 $1,540.80 <br /> SUBTOTAL INSPECTION FEE $17,951 <br /> Page 1 oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.