Laserfiche WebLink
Regarding the Climate Action Plan, Mr. Dolan reported that analysis is being done on <br /> greenhouse gas emissions and ultimately the City will probably have to adopt some programs <br /> and regulations to achieve the goals. He stated staff will consider outcomes of this analysis and <br /> coordinate accordingly between the two processes. <br /> Mr. Dolan reported payback information is outlined in Attachment 10 which notes the payback <br /> for a 2,000 square foot, single family home is 10 -13 years; a 1 -story office building of 10,000 <br /> square feet is 7 to 13 years; a 5 -story office building is 2.5 to 3.8 years. <br /> Staff conducted an exhaustive public outreach effort and received support from each group <br /> visited. There was general support from the Planning Commission for the transition and while <br /> the vote was 3 -2, the 2 commissioners who voted against the motion were specific about why <br /> they did not vote for the motion. They thought the PV -ready requirement should be mandatory <br /> as opposed to being an elective. Staff's opinion is that it is not necessarily the best solution in all <br /> cases, and to make it mandatory is somewhat self- defeating. <br /> Procedurally, Mr. Dolan asked that Council consider staffs recommendation, consider <br /> discussing additional local amendments beyond those recommended such as the PV- ready, <br /> and stated a CEQA finding would have to be made that this is statutorily exempt from CEQA. <br /> The Council would thereby introduce the ordinance amending the Pleasanton Municipal Code to <br /> adopt the California Green Building Standards Code with local amendments. Mr. Dolan pointed <br /> out two corrections to the staff report on page 5 of 10. Under footnote #5, the second to the last <br /> line states, "include" which should state "excludes ". Reference is also made to the fact that <br /> Stopwaste.org provides third party review, which they do not provide. <br /> Lastly, staff received feedback from Stopwaste.org who had concerns with the verification <br /> procedures for some of the requirements presented in Tiers 1 and 2. Staff is not proposing Tier <br /> 2 at this time and therefore, their concerns would affect Tier 1 only. They do not believe the <br /> State has provided adequate guidance on how to verity some of the measures. Staff believes it <br /> can provide verification and has much more experience than most communities, and have <br /> certified staff members who verify everyday. And while staff acknowledges their concerns, Mr. <br /> Dolan suggested the following options: 1) Do not abandon the Build It Green system and move <br /> forward with the CalGreen for commercial only; and 2) continue to use the Build It Green system <br /> for a period of six months until the adequate guidance is provided by the State. <br /> Councilmember Sullivan referred to the verification process and said his understanding is that <br /> commercial requirements were released two days ago. He asked for more information about the <br /> verification process as proposed by the State as compared to what the City is currently doing. <br /> Dennis Corbett noted there is a requirement for commissioning of new buildings over 10,000 <br /> square feet in the CalGreen mandatory measures. Initial regulations only indicated that they <br /> shall be commissioned and unclear was who did it and how should it be done. On November 9, <br /> 2010, the Budding Standards Commission released a 32 -page guide on how to do this, which <br /> provides for a certain amount of flexibility. The current Energy Code requires acceptance testing <br /> for lighting controls and for certain heating and air conditioning measures, which is currently <br /> done by either the mechanical engineer that designed the system or by the installer. On the <br /> commissioning side, they indicated there was a lot of discretion in who the City decides is <br /> appropriate for this. It can be those same parties or a separate independent party such as what <br /> is similarly done for inspections for welding under the Building Code. <br /> City Council Minutes Page 7 of 15 January 4, 2011 <br />