My WebLink
|
Help
|
About
|
Sign Out
PC 2002-67
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-67
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:53:55 PM
Creation date
4/18/2003 10:51:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/23/2002
DOCUMENT NO
PC 2002-67
DOCUMENT NAME
PDR-244
NOTES
APPLICATION OF BAHMAN TEHRANI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2002-67 <br />Page 3 <br />EXHIBIT B <br />CONDITIONS OF APPROVAL <br />PDR-244 <br />500 MAIN STREET <br />The proposed building modifications covered by this approval shall conform <br />substantially to the elevations and details of windowsill and mullion, shown in <br />Exhibit "A", dated "Received, October 15, 2002", on file with the Planning <br />Department, except as modified by the following conditions. Minor changes to this <br />proposal may be allowed subject to approval by the Planning Director if found to be <br />in substantial compliance with the approved exhibits. <br />This design review approval does not include the proposed neon tube band. No neon <br />tube band shall be installed on the cornice or other locations along the perimeter of <br />the building on the Main Street and Neal Street elevations. <br />This design review approval does not include the mauve color for the awnings. The <br />awning color, building colors, and sign design/colors shall be subject to the review <br />and approval of the Planning Commission, with consideration of the recommendation <br />of the Pleasanton Downtown Association Design Committee. <br />The applicant shall consult the project architect during the construction period to <br />ensure that windowsills and mullions aze installed per the approved design review <br />plans and that the details aze carried out accurately. Prior to the final inspection by the <br />Building Department, the applicant shall submit a written confirmation letter from the <br />project architect verifying that the windows have been constructed in conformance <br />with the approved plan and details. <br />The applicant shall obtain all building, encroachment, and other applicable City <br />permits for the proposed development prior to the commencement of construction. <br />The building permit plans shall contain the approved window treatment details plus <br />any other details determined to be necessary by the Platming Director to show that the <br />window modifications will be installed as approved and to conform to the existing <br />window treatment on the building. The mullions shall be installed integrally to the <br />framing; add-on mullions shall not be used. <br />6. This design review approval will lapse one yeaz from the effective date of approval <br />unless a building permit is issued and construction is commenced and is diligently <br />pursued towazd completion or a design review extension has been approved by the <br />City. <br />7. Final inspection by the Planning Department is required prior to occupancy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.