additional information as may be required or may apply for an exemption under Section <br />17.50.080. <br />d. Timing of Review: The Green Building Compliance Official shall review <br />the Green Building Project Checklist and all other pre-permitting documentation for <br />compliance with this Chapter prior to the hearing on Design Review or Planned Unit <br />Development Design Review, and again during plan check. <br />17.50.070 Compliance. <br />a. Compliance Review: Building Division staff shall verify that the green <br />building measures and provisions indicated in the pre-permitting documentation are being <br />implemented at foundation inspection, framing inspection, and prior to issuance of a final <br />certificate of occupancy. The Green Building Compliance Official or the Building <br />Division staff may also conduct other inspections as needed to ensure compliance with <br />this Chapter. If, as a result of any such inspection, the Green Building Compliance <br />Official or Building Division staff determine that the covered project does not comply <br />with the pre-permitting documentation, astop-work order may be issued. At the <br />discretion of the Green Building Compliance Official such astop-work order may apply <br />to the portion of the project impacted by noncompliance or to the entire project. The <br />stop-work order shall remain in effect until the Green Building Compliance Official <br />determines that the project will be brought into compliance with the pre-permitting <br />documentation and this Chapter. <br />b. Substitution of Credits: During compliance review for covered projects, <br />flexibility may be exercised by the Green Building Compliance Official to substitute the <br />approved credits with other credits in the approved LEEDTM Rating System. Substitution <br />shall occur only at the request of the applicant and when it is determined that the <br />originally approved credits are no longer feasible. <br />