My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
011811
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2011 12:22:05 PM
Creation date
1/12/2011 12:21:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/18/2011
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The basement exit stairways are built to exit directly to the outside of the building <br /> isolating the basement from the remaining part of the structure. This provides complete <br /> isolation protection from the first floor space and the basement creating the safest fire exit <br /> possible. <br /> The basement at 780 Main Street is approximately 4,000 square feet and is a clean, <br /> natural temperature controlled space that can be used to attract more people to the <br /> downtown. This basement space has the unique quality of storage that is not going to <br /> destroy furniture from summer heat or clothing from rats. It will provide secure <br /> accommodations items and materials mentioned above. <br /> PROPOSED USE PLAN <br /> 780 Main Street Enterprise, operating out of Suite 210 on the second floor of 780 Main <br /> Street, would provide limited public storage in the basement insuring that the storage in <br /> the basement would be non- toxic, non - hazardous, clean paper record storage, that <br /> included an area that contained Data Vaults, boxes of Microfiche, computer data files in <br /> various forms, and other items not hazardous or toxic. <br /> In support of stimulating downtown Main Street, during these trying times of economic <br /> challenges, we feel that it is important to draw many more people into the downtown area <br /> so people will visit and shop here. Recently, efforts have been taken by local downtown <br /> businesses, i.e. Barone's Restaurant, the Red Coat Pub to attract people into downtown. <br /> This would be another draw for people to come into downtown. <br /> Twenty cages would be constructed on an as needed bask to allow new tenants in the <br /> public storage area to select the size of space needed making the process more flexible. <br /> The cages, not having walls that would block the existing sprinklers, are arranged to <br /> allow the existing fire sprinkler system to operate as designed. <br /> It is our experience with our tenants that storage space is visited possibly only once a year <br /> if that. Parking would not be affected, as data storage is something rarely needing access. <br /> This re- zoning is completely underground and no visible changes to the outside of the <br /> property or building at 780 Main Street is required. <br /> Sincerely, <br /> l / <br /> k et/L <br /> Ed Churka <br /> Attached: 1 Revised Drawing of existing basement and proposed use dated 7/30/2010 <br /> BASEMENT . STORAGE REZONING APPLIC. -_2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.