Laserfiche WebLink
developer may request pro-rata reimbursement from other benefiting properties for the storm <br />drain line/ bioswale. <br />Development Plan Lapsin¢ <br />142. This development plan shall be of no further validity and the project developer shall be <br />required to submit the same or new development plan for City approval prior to development <br />of the site in the event that the project developer fails to record a final map within two (2) <br />years of this PUD Development Plan. <br />Traffic Mitigations <br />143. The following traffic improvements will be completed with the construction of the single- <br />family, senior housing, and/or church portion of the project: <br />a. All on-site streets as shown on Exhibit A. <br />b. The traffic calming measures shown along Mohr Avenue and Kamp Drive (south) <br />as shown on Exhibit A. <br />c. Modify Q Street to include on-street bike lanes up to P Street, two northbound lanes <br />plus a left turn lane at the church private road, transitioning to one northbound lane. <br />d. Include an urban round-about at Q Street-P Street intersection and align the senior <br />apartment driveway to this round-about, and construct P Street as far easterly as the <br />school option site boundary. <br />e. Construct Busch Road to include two left turn lanes at Q Street; one of the two <br />through lanes may be dropped at the discretion of the City Traffic Engineer. <br />f. The QStreet-Busch Road intersection shall be signalized. <br />g. Valley Avenue shall incorporate two southbound left turn lanes, with corresponding <br />modifications as approved by the Public Works Director; all widening shall occur <br />on the east side of Valley Avenue. <br />h. In the event the modification to the Valley Avenue-Busch Road intersection requires <br />removal of the pedestrian crosswalk, the developer (1) shall install a sidewalk <br />westerly to Quarry Lane and modify that signal to accommodate pedestrians and (2) <br />shall install a continuation of the Iron Horse Trail southerly to Boulder Street and <br />modify that signal to accommodate pedestrians. <br />i. The Boulder -Valley intersection shall be signalized. <br />j. The Valley-Stanley-Bernal intersection shall be modified in a manner to ensure LOS <br />D at AM and PM peak hour periods by constructing a free westbound to northbound <br />right turn lane with corresponding changes, or an alternative capacity enhancement <br />approved by the City Traffic Engineer. <br />k. The First-Ray-Vineyard intersection shall be modified to restripe the eastbound lane <br />for one through/left turn lane and one right turn lane. <br />1. The Bemal-First-Sunol intersection shall be modified to include westbound triple <br />left turn lanes with corresponding changes or an alternative approved by the City <br />Traffic Engineer to achieve LOS D at AM and PM peak hour periods. <br />Planning Commission Page 29 July 24, 2002 <br />