My WebLink
|
Help
|
About
|
Sign Out
PC 2002-39
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:48:24 PM
Creation date
4/16/2003 8:05:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/10/2002
DOCUMENT NO
PC 2002-39
DOCUMENT NAME
PDR-226
NOTES
JERRY AND LAURA RANEY FOR DRA.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2002-39 <br />Page 11 <br />project developer shall enter into a maintenance agreement for the oil/water sepazator <br />with the City. <br />63. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br />64. The project developer shall include erosion control measures on the final grading plan, <br />subject to the approval of the City Engineer. The project developer is responsible for <br />ensuring that the contractor is awaze of such measures. All cut and fill slopes shall be <br />revegetated and stabilized as soon as possible after completion of grading, in no case later <br />than October 15. No grading shall occur between October 15 and April 15 unless <br />approved erosion control measures are in place, subject to the approval of the Building <br />Department. Such measures shall be maintained until such time as permanent <br />landscaping is in place. <br />65. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br />66. The design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Engineer. <br />67. Storm drainage swales, gutters, inlets, outfalls, and channels not within the azea of a <br />dedicated public street or public service easement approved by the City Engineer shall be <br />privately maintained by the property owners or through an association approved by the <br />City. <br />68. Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br />approved point of dischazge, meets any and all applicable requirements of the Alameda <br />County Flood Control District -Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazazd Program, the California Department of <br />Fish and Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this development. <br />69. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay. Or street reconstruction if deemed warranted by <br />the City Engineer. <br />70. Electric power distribution, gas distribution, communication service, Cable television, <br />and any required alarm systems shall be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City Engineer or Director of Building <br />Inspection for on-site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.