My WebLink
|
Help
|
About
|
Sign Out
PC 2002-31
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:47:19 PM
Creation date
4/16/2003 7:34:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/14/2002
DOCUMENT NO
PC 2002-31
DOCUMENT NAME
VINEYARD AVINUE CORRIDOR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. The nature of the infrastructure requirements to support development in the <br />eastern sector of the Specific Plan azea requires up-front construction of the <br />realignment of Vineyazd Avenue and construction of most of the utilities within <br />it, a level of infrastructure financing typically beyond the ability of the small <br />projects within the Corridor to undertake alone. The City and Property Owner <br />acknowledge that implementation of the Specific Plan is a lazge-scale undertaking <br />occurring over several yeazs. Property Owner is unwilling to incur the required <br />investment or grant the use of its Property for public infrastructure without <br />assurance from the City that all phases of its Project can be developed, used, and <br />sold irr accordance with the approvals granted by the City. <br />F. The downturn in the economy in 2001 has led several developers to postpone <br />planned development within the Corridor, essentially forcing all development in <br />the eastern sector to be delayed. <br />G. The Pleasanton Unified School District (the "District") has planned an elementary <br />school within the Corridor, has purchased property, has negotiated a construction <br />financing program, and seeks to build the school in the short tenn. The school <br />requires much of the road and utility improvements planned within the relocated <br />Vineyard Avenue to be constructed in order for the school construction to <br />proceed. <br />Revision #3, Draft Hahner Development Agreement Page 3 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.