My WebLink
|
Help
|
About
|
Sign Out
PC 2002-19
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:41:13 PM
Creation date
4/16/2003 6:27:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/27/2002
DOCUMENT NO
PC 2002-19
DOCUMENT NAME
PDR-167
NOTES
DRA.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2002-19 <br />Page 13 <br />debris from entering the storm drain system. Such measures may include, but are not <br />limited to, hydroseeding, hay bales, sandbags, and siltation fences and are subject to the <br />review and approval of the City Engineer/Director of Building Inspection. If no grading <br />plan is required, necessary erosion control/storm water quality measures shall be shown on <br />the site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The project developer is responsible for ensuring that the <br />contractor is awaze of and implements such measures. <br />79. The project developer is responsible for implementing the following measures during all <br />construction phases of the subject project: <br />a. Gather all construction debris on a regular basis and place them in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water pollution. <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement, and storm drains adjoining the project site. During wet weather avoid <br />driving vehicles off paved areas. <br />c. Broom sweep the public street pavement adjoining the project site on a daily <br />basis. Caked-on mud or dirt shall be scraped from these areas before sweeping. <br />d. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />neazest the downstream side of the project site in order to retain any debris or dirt <br />flowing into the City storm drain system. Filter materials shall be maintained <br />and/or replaced as necessary to ensure effectiveness and to prevent street flooding. <br />Dispose of filter particles in the trash. <br />e. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br />project site that have the potential for being discharged to the storm drain system <br />through being windblown or in the event of a material spill. <br />£ Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br />g. Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.