Laserfiche WebLink
303A.5 Suspension or Revocation. The Building and Safety Official is authorized to <br /> suspend or revoke a permit issued under the provisions of this code wherever the <br /> permit is issued in error or on the basis of incorrect, inaccurate or incomplete <br /> information, or in violation of any ordinance or regulation or any of the provisions of this <br /> code. <br /> SECTION 304A — FEES <br /> 304A.1 General. A permit shall not be valid until the fees prescribed by law have <br /> been paid. Nor shall an amendment to a permit be released until the additional fee, if <br /> any, has been paid. Fees shall be assessed in accordance with the provisions in the <br /> fees and charges section of the Pleasanton Municipal Code. <br /> 304A.2 Permit Fees. The fee for each permit shall be as set forth in the fees and <br /> charges section of the Pleasanton Municipal Code. Where a technical code has been <br /> adopted by the City of Pleasanton for which no fee schedule is shown in the Pleasanton <br /> Municipal Code, the fee required shall be established by the Building and Safety Official <br /> base on time and material. <br /> The applicant for a permit shall provide an estimated permit value at time of application. <br /> Permit valuations shall include total value of work, including materials and labor, for <br /> which the permit is being issued, such as finish work, painting, roofing, electrical, gas, <br /> mechanical, plumbing equipment, elevators, fire - extinguishing systems and permanent <br /> systems. If, in the opinion of the Building and Safety Official, the valuation is <br /> underestimated on the application, the permit shall be denied, unless the applicant can <br /> show detailed estimates to meet the approval of the Building and Safety Official. Final <br /> building permit valuation shall be set by the Building and Safety Official. <br /> Any person who commences any work on a building, structure, electrical, gas, <br /> mechanical or plumbing system before obtaining the necessary permits shall be subject <br /> to an investigation fee established by the Building and Safety Official that shall be in <br /> addition to the required permit fees. <br /> The payment of the fee for the construction, alteration, removal or demolition for work <br /> done in connection to or concurrently with the work authorized by a building permit shall <br /> not relieve the applicant or holder of the permit from the payment of other fees that are <br /> prescribed by law. <br /> 304A.3 Plan Review Fees. When submittal documents are required by Section <br /> 302A.2, a plan review fee shall be paid at the time of submitting the submittal <br /> documents for plan review. <br /> A. The building, energy, access, fire sprinkler, fire alarm, grading, on -site, electrical, <br /> mechanical and /or plumbing plan review fee shall be as shown in the Fees and <br /> Charges Table of the Pleasanton Municipal Code. <br /> 24 <br />