My WebLink
|
Help
|
About
|
Sign Out
CCMIN101910
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2010
>
CCMIN101910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2010 12:27:31 PM
Creation date
11/24/2010 12:27:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
10/19/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
CCMIN101910
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dollars for the new project, he asked what this equates to losses in sales dollars to the existing <br /> grocery stores in the City. <br /> Ms. Wagner replied that it varies by grocery store. Currently, the average sales per store are <br /> above average. Therefore, with above average sales, there is actually room for an additional <br /> grocery store. When the analysis is done with the addition of the Safeway Store, it takes that <br /> average sale down to "good ". Therefore, one could say the capacity for an additional store has <br /> been absorbed once this project is approved. <br /> Traffic Engineer Tassano presented traffic analysis, stating that staff covered many alternatives <br /> with the project, looked at the AM and PM peak traffic, restricted and full access to Bernal <br /> Avenue, a modified full access to Bernal Avenue, near term and build out conditions, and a <br /> phased out approach. He said staff settled on a modified full access to Bernal Avenue, which <br /> means that Bernal at Koll Center will be full access to the property to the south, but will only <br /> contain its existing access to the property to the north. So, while a left turn can be made into the <br /> Koll Center to the north and a right turn out, you will not be able to make a left turn or through <br /> movement out of there. The full access is to the Safeway location. <br /> He shared the phased approach which is what Gateway would like to take with this project. He <br /> broke it down in two traffic volumes, both AM and PM peak hours for each of the developments, <br /> the Safeway lifestyle traffic volumes, the neighborhood commercial, the gas station and the <br /> pharmacy. It totals 683 PM peak hour trip for Phase 1. Phase 11 would include the 588,000 <br /> square feet of office which would be an additional 877 PM peak hour trips. <br /> Councilmember Sullivan questioned where funding comes from for the two improvements. Mr. <br /> Tassano said they are currently funded through the Bernal Interchange Corporation. <br /> Mayor Hosterman questioned the opportunity of improving the right turn onto northbound 1 -680 <br /> without having to remove trees. Mr. Tassano said instead of creating a free right turn, they <br /> would have to shift the lanes to the north which would end up creating a new 12 -foot lane next <br /> to the sidewalk where there is a line of trees. He said the previous design had the full 550 feet <br /> constructed for the right turn pocket which would shift everything to the north and take out those <br /> trees. If staff retains that right turn pocket, instead of building additional capacity they would <br /> switch the thru lane to combine thru right hand turn lanes. <br /> Councilmember McGovern said the City will have to put more signals on Valley anyway, and at <br /> Paseo Santa Cruz and others. Mr. Tassano said this is in the General Plan, although the current <br /> direction is to hold off until such a time that it is required for more than just a few minutes in the <br /> peak. <br /> Mr. Dolan said staff and the Planning Commission also requested the applicant provide visual <br /> simulations from various viewpoints, and he presented this from the freeway looking from the <br /> first corner, and from two locations from the off -ramp when turning right on Bernal. The <br /> landscaping is lush in the area and only small views of the buildings would be seen. <br /> Councilmember McGovern confirmed the sidewalk in the area exists and is incorporated into the <br /> site plan. <br /> Councilmember Sullivan said the City is embarking on looking at other places where residential <br /> can be built, and this site has been one of those potentially considered. He asked how the traffic <br /> between the proposed office project compares to the 30 unit to the acre residential at Hacienda <br /> BART station. Mr. Tassano said in looking at the highest intensity use on the remaining 26 <br /> acres which would be assumed to be the 588,000 square feet of office, if converted into <br /> City Council Minutes Page 5 of 13 October 19, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.