My WebLink
|
Help
|
About
|
Sign Out
ORD 2014
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
11/23/2010 1:30:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/16/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2014
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f) If permanent access or site paving is not provided, the carrying capacity of the <br />emergency vehicle access shall be 69,000 pounds under all weather conditions. <br />g) Site staging area(s) shall be provided for materials and equipment. All staging <br />areas shall be outside of the emergency vehicle access route shown on the <br />approved plans. <br />h) Where on -site fire hydrant(s) are required, they shall be installed, flushed and all <br />valves open prior to any construction above the foundation or slab. This includes <br />concrete tilt -up and masonry buildings. <br />i) On -site fire hydrant(s) shall not be obstructed and shall be sufficiently above grade <br />to have all hydrant valves and outlets accessible for emergency use. <br />j) Prior to request for final inspection, all access roads, on -site access and fire <br />hydrants shall be provided. All fire hydrants shall be acceptance inspected and <br />tested to applicable City Public Works Standards. <br />k) Where a project is phased as part of the development approved by the City, <br />specific access, water supply and fire hydrant installations will be required as part <br />of each phase. As needed a phasing plan with these improvements will be <br />required. <br />CODE REQUIREMENTS <br />Building <br />(Project applicant or developers are responsible for complying with all applicable Federal, State <br />and City codes and regulations regardless of whether or not the requirements are part of this <br />list. The following items are provided for the purpose of highlighting key requirements.) <br />128. The project applicant or developer shall submit a building survey and /or record of survey <br />and a site development plan in accordance with the provisions of Chapter 18.68 of the <br />Municipal Code of the City of Pleasanton. These plans shall be approved by the Chief <br />Building Official prior to the issuance of a building permit. The site development plan <br />shall include all required information to design and construct site, grading, paving, <br />drainage, and utilities. <br />129. The project applicant or developer shall post address numerals on the building so as to <br />be plainly visible from all adjoining streets or driveways during both daylight and night <br />time hours. <br />130. The building covered by this approval shall be designed and constructed to meet Title 24 <br />state energy requirements. <br />131. All building and /or structural plans must comply with all codes and ordinances in effect <br />before the Building Division will issue permits. <br />132. Any tenant improvement plans shall be submitted to the Building and Safety Division for <br />review and approval. <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.