STANDARD CONDITIONS OF APPROVAL <br />Engineering <br />89. A "Conditions of Approval" checklist shall be completed and attached to all plan checks <br />submitted for approval indicating that all conditions have been satisfied. <br />90. The project applicant or developer shall comply with the recommendations of the <br />project's geotechnical consultant. The project applicant or developer's geotechnical <br />consultant shall review and approve all foundation, retaining wall, and drainage <br />geotechnical aspects of the final development plans to ensure that the recommendations <br />have been properly incorporated into the development. The consultant shall certify by <br />writing on the plans or as otherwise acceptable to the City Engineer that the final <br />development plan is in conformance with the geotechnical report approved with the <br />project. <br />91. The project applicant or developer shall arrange and pay for the geotechnical consultant <br />to inspect and approve all foundation, retaining, and wall and drainage geotechnical <br />aspects of project construction. The consultant shall be present on site during grading <br />and excavation operations. The results of the inspections and the as -built conditions of <br />the project shall be certified in writing by the geotechnical consultant for conformance to <br />the approved plans and geotechnical report and submitted to the City Engineer for <br />review and approval prior to occupancy. <br />92. The project applicant or developer shall grant an easement to the City over those <br />parcels needed for public service easements (P.S.E.) and which are approved by the <br />City Engineer, or other easements, which may be designated by the City Engineer. <br />93. The project applicant or developer shall construct vertical P.C.C. curbs and gutters <br />within this development unless otherwise approved by the City Engineer. When the <br />sidewalk is adjacent to the curb and gutter, they shall be poured monolithically. <br />94. All dry utilities (electric power distribution, gas distribution, communication service, Cable <br />television, street lights and any required alarm systems) required to serve existing or <br />new development shall be installed underground in conduit or in a joint utility trench. <br />95. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the project <br />applicant or developer. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. <br />96. This approval does not guarantee the availability of sufficient water and /or sewer <br />capacity to serve the project. <br />97. A final parcel map shall be required to subdivide the property into the Phase I and Phase <br />II developments. With the final parcel map, the project applicant or developer shall <br />create easements for ingress /egress, drainage, and utilities between Phase I and Phase <br />11 subject to the review and approval of the City Engineer. <br />98. There shall be no direct roof leaders connected to the street gutter or storm drain <br />system, unless otherwise approved by the City Engineer. <br />24 <br />