My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
111610
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 2:55:32 PM
Creation date
11/10/2010 2:55:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/16/2010
DESTRUCT DATE
15Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The goal of the Bernal Community Park Master Plan was to create groupings of sport <br /> fields and related facilities within a forested framework of open space on approximately <br /> 50 acres of parkland. Park facilities are to be interconnected with one another and the <br /> outlying Bernal Property "Grand Meadow" through a coordinated system of mounded <br /> landforms, plant communities, trails and public art. A multi -use program of active sports <br /> facilities and activities is to remain flexible in order to respond to the changing <br /> community recreational needs over time. <br /> Bernal Community Park (T) is located at 7001 Pleasanton Avenue and upon completion <br /> will be approximately 50 acres in overall size. The site terrain is mainly flat with the <br /> exception of a north /south drainage canal which is situated in the easternmost portion of <br /> the Bernal Property; south of Bernal Avenue, northeast of Valley Avenue, and west of <br /> the Union Pacific Railroad tracks. The park will be constructed in four (4) phases, of <br /> which the first phase was recently completed. At the completion of phase four (4), the <br /> park's proposed amenities shall include three (3) lighted baseball fields, three (3) lighted <br /> multi - purpose fields, a community center, a play apparatus area, a concession building, <br /> restroom facilities, group picnic area, amphitheater, park maintenance building, trails, <br /> parking areas and other active space uses. <br /> Although the 2006 Master Plan refers to the community park site as the "Bernal <br /> Community Park"; the name for the park has not been formally adopted. At its <br /> November 12, 2009 meeting, the Parks and Recreation Commission requested that a <br /> Public Hearing be conducted to select and recommend to the City Council a permanent <br /> name for the community park located at 7001 Pleasanton Avenue. <br /> On January 14, 2010, the Parks and Recreation Commission held a Public Hearing to <br /> consider the permanent name for Bernal Community Park (T). Notices regarding the <br /> Public Hearing were mailed to residents within 1,000 feet of the community park, and to <br /> interested parties on the Bernal Property mailing list. In an effort to assist with the park <br /> naming process, staff developed several potential names for the Commission's <br /> consideration: <br /> • Bernal Community Park <br /> • Central Park <br /> • Ridge View Community Park <br /> • Pleasanton Community Park <br /> • Ohlone Community Park <br /> • Valley Community Park <br /> • Branta Community Park <br /> • Hayfield Community Park <br /> • Red Oat Community Park <br /> • Harvest Community Park <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.