My WebLink
|
Help
|
About
|
Sign Out
ORD 1179
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 8:51:59 AM
Creation date
3/18/1999 6:34:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1179
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31. That a sanitary sewer sampling manhole be provided on the <br /> sanitary sewer lateral from each building, unless otherwise <br /> waived by the City Engineer. <br /> <br /> 32. That prior to issuance of a building permit, the developer <br /> shall pay the applicable Zone 7 and City connection fees and <br /> water meter cost for any water meters (irrigation meters) not <br /> directly related to a building permit. <br /> <br /> 33. That the developer dedicate to the City for street <br /> right-of-way purposes those parcels of land intended <br /> to be public streets. <br /> <br /> 34. That the developer grant an easement to the City over <br /> those parcels shown as public service easements (P.S.E.) <br /> and which are approved by the City Engineer or other parcels <br /> which may be designated by the City Engineer. <br /> <br /> 35. That approval of the design for the line, grade, and <br /> structural sections for the streets serving this develop- <br /> ment be withheld pending final engineering design and <br /> review by the City Engineer. <br /> <br />36. That vertical P.C.C. curbs and gutters be constructed <br /> within this development unless otherwise approved by the <br /> City Engineer and that the curb and gutter be poured mono- <br /> lithically with the sidewalk when the sidewalk is adjacent. <br /> <br />37. That all existing wells, septic tanks or holding <br /> tanks on the site be properly sealed, filled and abandoned <br /> prior to the start of grading operations unless Zone 7 <br /> retains specific wells for observation wells, or <br /> special approval is obtained from the City Engineer for <br /> temporary use of an existing well for construction water. <br /> Any wells designated for abandonment or any wells encountered <br /> during construction, are to be destroyed in accordance with a <br /> permit obtained from Zone 7 by calling (415) 443-9300. <br /> <br />38. That the haul route for all materials to and from this <br /> development be approved by the City Engineer prior to the <br /> start of any construction. <br /> <br /> 2/1/84 <br /> Rev. 10/84 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.