My WebLink
|
Help
|
About
|
Sign Out
ORD 2011
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
10/26/2010 2:20:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/19/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2011
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Construction Best Management Plan shall include, but is not limited to, the <br /> following: <br /> a) All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall occur between the hours of <br /> 7:00 a.m. to 8:00 p.m., Monday through Sunday. No construction shall be allowed <br /> on State or Federal Holidays. The Director of Community Development may allow <br /> earlier construction "start times" for specific construction activities (e.g., concrete <br /> foundation /slab pours) if it can be demonstrated to the satisfaction of the Director <br /> of Community Development that the construction and construction traffic noise will <br /> not affect nearby residents. <br /> b) A construction staging plan shall be designated for all materials, equipment, and <br /> vehicles including parking for construction works and personnel. <br /> c) A construction truck route shall be designated to keep all construction traffic away <br /> from nearby residential streets. No construction traffic may use Stoneridge Drive <br /> at any time. Prior to construction, the construction traffic route, construction hours, <br /> and contact names and telephone numbers shall be posted on the driveway <br /> entrances, throughout the construction site, and in any construction trailer(s). <br /> d) Comprehensive traffic control measures shall be implemented, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. <br /> e) The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of a permit, and shall include the provision <br /> to monitor the street surfaces used for the haul route so that any damage and <br /> debris attributable to the haul trucks is identified and corrected at the expense of <br /> the project applicant or developer. <br /> f) All internal combustion engines on grading or construction equipment used shall be <br /> equipped with a muffler equal to or better than that supplied by the vehicle <br /> manufacturer. All equipment shall be maintained in good mechanical condition so <br /> as to minimize noise and air pollution from faulty engine, drive train, and other <br /> components. No muffler or exhaust system shall be equipped with cutout, bypass, <br /> or similar device intended to thwart quieting. <br /> g) Dust control best management practices, as approved by the City Engineer, shall <br /> be followed at all times during grading and construction operations. Such <br /> measures may include watering of exposed surfaces twice a day, and more <br /> frequent watering when wind speeds exceed 15 mph; covering of stockpiled earth; <br /> covering of trucks hauling dirt if windy conditions prevail. Failure to keep dust <br /> under control may result in the stoppage of all work until a modified plan <br /> acceptable to the City Engineer is approved and implemented. <br /> h) Except for security trailers staffed by licensed security personnel, at no time shall <br /> campers, trailers, motor homes, or any other vehicle be used as living or sleeping <br /> quarters on the construction site. All such vehicles shall be removed from the site <br /> at the end of each workday. Construction trailers shall be allowed to be placed on <br /> the project site for daily administration /coordination purposes during the <br /> construction period. <br /> i) All Urban Storm Water Construction Requirements listed further in these conditions <br /> of approval shall be implemented. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.