My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENT 10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
101910
>
13 ATTACHMENT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 3:53:50 PM
Creation date
10/14/2010 11:39:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/19/2010
DESTRUCT DATE
15Y
DOCUMENT NO
13 ATTACHMENT 10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF TABLES <br /> Table ES -1 Near -term and Cumulative Condition Impact and Mitigation Measure Summary vii <br /> Table 1 Signalized Intersection LOS Criteria 5 <br /> Table 2 Unsignalized Intersection LOS Criteria 6 <br /> Table 3 Freeway Mainline LOS Criteria 7 <br /> Table 4 Freeway Ramp Merge /Diverge LOS Criteria 8 <br /> Table 5 Existing Intersection Levels of Service 17 <br /> Table 6 Existing Freeway Mainline Levels of Service 19 <br /> Table 7 Existing Ramp Merge /Diverge Levels of Service 19 <br /> Table 8 Project Trip Generation 22 <br /> Table 9 Near Term intersection Level of Service 37 <br /> Table 10 Cumulative intersection Level of Service 39 <br /> Table 11 Near -Term With Mitigation Peak Hour Intersection Levels of Service 43 <br /> Table 12 Cumulative Conditions With Mitigation Peak Hour Intersection Levels of Service 44 <br /> Table 13 Existing With Project 1 -680 Ramp Mainline Levels of Service 46 <br /> Table 14 Existing With Project 1 -680 Ramp Merge /Diverge Levels of Service 46 <br /> Table 15 Cumulative Conditions 1 -680 Ramp Mainline Levels of Service 47 <br /> Table 16 Cumulative With Project 1 -680 Ramp Merge /Diverge Levels of Service 48 <br /> Table 17 2015 AM Peak Hour MTS Roadway Segment Analysis 51 <br /> Table 18 2015 PM Peak Hour MTS Roadway Segment Analysis 53 <br /> Table 19 2035 AM Peak Hour MTS Roadway Segment Analysis 55 <br /> Table 20 2035 PM Peak Hour MTS Roadway Segment Analysis 57 <br /> Table 21 City Code Automobile Parking Requirements 65 <br /> Table 22 Parking Demand Analysis 65 <br /> Table 23 Daily Traffic Estimates on Neighborhood Streets 74 <br /> Table G -1 Bernal Corridor Analysis Percent Demand Served <br />
The URL can be used to link to this page
Your browser does not support the video tag.