Laserfiche WebLink
TABLE OF CONTENTS <br /> EXECUTIVE SUMMARY v <br /> Project Transportation Characteristics v <br /> Findings and Recommendations v <br /> 1. INTRODUCTION 1 <br /> Study Purpose 1 <br /> Analysis Scenarios 1 <br /> Study Intersections and Roadway Segments 4 <br /> Analysis Methods 4 <br /> Significant Impact Criteria 8 <br /> Report Organization 9 <br /> 2. EXISTING CONDITIONS 11 <br /> Study Area Roadways 11 <br /> Existing Traffic Volumes and Lane Configurations 13 <br /> Transit Service 13 <br /> Pedestrian and Bicycle Facilities 15 <br /> Existing Intersection Levels of Service 16 <br /> Existing Freeway Levels of Service 18 <br /> 3. PROJECT TRAFFIC 20 <br /> Project Description 20 <br /> Proposed Trip Generation 20 <br /> Trip Distribution and Assignment 23 <br /> 4. INTERSECTION OPERATIONS 28 <br /> Near -Term Forecasts 28 <br /> Cumulative Forecasts 29 <br /> Intersection Operations 36 <br /> Alternative Access Evaluation 40 <br /> Intersection Mitigation Measures 40 <br /> Cumulative Mitigation 43 <br /> 5. FREEWAY OPERATIONS 45 <br /> Freeway Forecasts 45 <br /> Freeway system improvements 45 <br /> Existing Freeway Operations 45 <br /> Cumulative Freeway Operations 47 <br /> 6. ALAMEDA COUNTY CONGESTION MANAGEMENT AGENCY (ACCMA) METROPOLITAN 49 <br /> TRANSPORTATION SYSYTEM (MTS) ROADWAY ANALYSIS <br /> ACCMA Roadway Analysis Study Area 49 <br /> Traffic Forecasts 49 <br /> Analysis Method 49 <br /> Significance Criteria 50 <br /> Analysis Results 50 <br /> Metropolitan Transportation System Mltgation Measures 59 <br /> 7. VEHICULAR SITE ACCESS, CIRCULATION AND PARKING 61 <br /> Vehicular Site Access 61 <br /> Vehicular On -Site Circulation 62 <br /> Parking 64 <br />