Laserfiche WebLink
Bernal Avenue and 1 -680. The central driveway frorn Bernal Avenue to Phase I and <br /> Phase 11 will function as the development's central north /south collector thereby <br /> reducing the amount of traffic using the development's Valley Avenue driveways. <br /> With this modification to Bernal Avenue, delivery trucks and vehicles to Phase 1 and <br /> to Phase 11 will then be able to avoid the Valley Avenue entrance driveways <br /> • One new right -turn only entrance /exit at 'Valley Avenue between Bernal Avenue and <br /> the first traffic circle. Adding this new driveway will reduce the amount of project <br /> traffic using the first Valley Avenue driveway entrance. <br /> • A total of 2,425 parking spaces, 612 parking spaces for Phase 1 and 1,813 parking <br /> spaces for Phase 11. <br /> • Three plaza areas in Phase 1 — one between Building Pad #3 and Shops #4 facing <br /> Bernal Avenue, one between Shops #4 and Shops #5 facing the Bernal <br /> AvenueNalley Avenue corner, and one between Shops #6 and Shops #7A facing <br /> Valley Avenue for outdoor dining. The sidewalks in front of the Phase I buildings <br /> are designed to accommodate sidewalk dining and special sales. <br /> • Two plaza areas in Phase 11 — one between Building #4 and Building #5 and one <br /> between Building #6 and Building #7. Provide a large entry court between Building <br /> #1 through #3. The plaza between Building #4 and Building #5 continues the <br /> design treatment of the previous development plan. <br /> • Amenities in the plaza areas such as seating, arbors and trellises, shade structures, <br /> landscaping, water features, potted plants, and public art. <br /> Building Design <br /> The proposed Phase 1 and Phase 11 buildings are designed to compliment the surrounding <br /> architecture and each other with standing seam metal roofs, granite /brick wainscots, wood <br /> trellises, awnings, and dark aluminum storefront window systems. The proposed building <br /> designs generally achieve a "four -sided design" with massing and detailing distributed to <br /> all building sides, and with "pedestrian scale" design details and elements. The Phase 1 <br /> building facades facing Bernal and Valley Avenues will have clear windows and, <br /> potentially, entry doors for accessibility to the public sidewalks. The Phase 11 building <br /> designs were updated from the designs shown with the previous approval to closely <br /> compliment the Phase 1 designs and to comply with present building code requirements. <br /> Figure 12 through Figure 14, on the following pages, are renderings of the retail and office <br /> portions of the proposal and of the proposed supermarket. <br /> Pleasanton Gateway Page 12 of 35 August 25, 2010 <br />