My WebLink
|
Help
|
About
|
Sign Out
ORD 1174
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 8:51:07 AM
Creation date
3/18/1999 6:29:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1174
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. That all utilities required to serve the development <br /> shall be installed underground. <br /> <br />11. That the applicant enter into an agreement with the <br /> City, approved by the City Attorney, which guarantees <br /> that all landscaping included in this project will <br /> be maintained at all times in a healthful, attractive <br /> and weedfree manner. Said agreement shall run with the <br /> land for the duration of the existence of the structures <br /> located on the subject property. <br /> <br />12. That all dwelling units in the development be constructed <br /> to meet the latest P.G.&E. Energy Conservation Home <br /> Standards. <br /> <br /> 13. That the following water conserving plumbing fixtures <br /> be installed: a) low flush water closets; b) shower <br /> flow control heads; c) aerators in interior faucets; <br /> and d) insulation of hot water lines. <br /> <br /> 14. That the applicant be aware that design review approval <br /> lapses within one year unless a building permit is issued <br /> and construction has commenced and is diligently pursued <br /> toward completion or an extension has been requested from <br /> the City. <br /> <br /> 15. That the developer acknowledges that the City of pleasanton <br /> does not guarantee the availability of sufficient sewer <br /> capacity to serve this development by the approval of <br /> this case, and that the developer agrees and acknowledges <br /> that building permit approval may be withheld if sewer. <br /> Capacity is found by the City not to be available- <br /> <br /> 16. That the location of any pad mounted transformers shall <br /> be subject to approval by the planning Division prior tO <br /> issuance of a building permit. Generally speaking such <br /> transformers shall not be located between any street and <br /> the front of a building. <br /> <br /> 17. That all buildings and/or structures must comply with all <br /> codes and ordinances in effect at the time required permits <br /> are issued by the Building Division. <br /> <br /> 18. That the development shall meet all requirements of the <br /> pleasanton Fire Code. <br /> <br /> 2/1/84 <br /> Rev. 10/84 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.