Laserfiche WebLink
Further background of the Signature Center Business Park and the subject Providian <br /> BankCorps/Washington Mutual campus is covered in the Background section of the <br /> attached Planning Commission staff report (Attachment 5). <br /> PLANNING COMMISSION HEARING <br /> The Planning Commission reviewed the proposal and supporting materials at its public <br /> hearing held on September 15, 2010. Attachment 6 is the minutes of the meeting. Bob <br /> Kubichek, representing LBA Reality and Mark Herman, project architect, made brief <br /> comments on the proposal and were available to answer questions. There was no <br /> other public testimony. <br /> PROJECT DESCRIPTION <br /> Figure 3, below, is the proposed site plan. <br /> —e ll 1 , 1 R ITUM I IIA L R <br /> r alli fi li r <br /> 4 <br /> JILOM1•_= III <br /> I 1 <br /> 1 / MV EMRY <br /> S 0 Ti i1 , <br /> III ' �o <br /> DOCK BL_C>,GE <br /> IMO o I G <br /> 5E7 BA G <br /> SET BACK <br /> la r <br /> 4 <br /> Figure 3, Proposed Site Plan for Building F. <br /> Page 4 of 9 <br />