Laserfiche WebLink
Division permit. The amount of this bond will be determined by the City <br /> Engineer. <br /> k. The applicants shall submit a pad elevation certification prepared by a <br /> licensed land surveyor or registered civil engineer to the Chief Building <br /> Official, certifying that the pad elevations and building location (setbacks) <br /> are pursuant to the approved plans, prior to receiving a foundation <br /> inspection for the structure. <br /> I. The height of the building shall be surveyed and verified as being in <br /> conformance to the approved building height as shown on Exhibit "B" or as <br /> otherwise conditioned. Said verification is the project developer's <br /> responsibility, shall be performed by a licensed land surveyor or civil <br /> engineer, and shall be completed and provided to the Building and Safety <br /> Division before the first framing inspection by the Building and Safety <br /> Division. <br /> m. The applicant shall submit a final utility plan showing the proposed sewer <br /> system, water supply, storm drainage, electric power distribution, gas <br /> distribution, communication service, cable television, and any required <br /> alarm system for the site. Said plan shall be subject to the review and <br /> approval of the City Engineer prior to the issuance of any building permits. <br /> n. Final inspection by the Planning Division is required prior to occupancy. <br /> o. Prior to issuance of building permit(s), the property owner shall pay the <br /> required commercial development school impact fee as prescribed by state <br /> law and as adopted by the Pleasanton Unified School District. <br /> p. Unless otherwise stated in the Development Agreement, prior to the first <br /> plan check of any Final Map, including Final Parcel Map related to the PUD <br /> site, the applicant's engineer /surveyor shall submit a preliminary copy of the <br /> Final Map or Parcel Map (whichever is applicable) along with a preliminary <br /> copy of the title report and a copy of the adjoining deeds and /or recorded <br /> maps to the City. The City will forward these documents to its consultant <br /> who will estimate the cost for examining the map and certifying that the map <br /> is technically correct and in accordance with Section 66442 of the California <br /> Subdivision Map Act. After the consultant has provided a cost estimate, the <br /> applicant's engineer /surveyor may submit the first plan check along with a <br /> deposit for these costs along with all other standard plan check fees. Any <br /> unused portion of the estimate will be returned to the applicant after the map <br /> is recorded. Similarly, if the applicant withdraws their application in writing <br /> prior to the consultant having performed the work, any unused portion of the <br /> deposit will be returned to the applicant. Conversely, should consultant's <br /> estimate be insufficient to cover all of the consultant's time, the applicant will <br /> Conditions of Approval /PUD -57 <br /> General Conditions <br /> 3 <br />