My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
092110
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 11:35:32 AM
Creation date
9/15/2010 3:45:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with BMPs targeted to reduce post- construction pollutants listed in <br /> Table 3.5 -5 of the EIR. <br /> This WQMP shall identify specific stormwater BMPs for reducing potential <br /> pollutants in stormwater runoff. BMPs shall be selected to target pollutants <br /> listed in Table 3.5 -5 of the EIR; selection criteria and documentation shall be <br /> incorporated into the WQMP. A qualified engineer shall prepare and <br /> submit, concurrently with the submittal of off-site or on -site improvement <br /> plans, (whichever comes first), the WQMP for review and approval by the <br /> City Engineer. The WQMP must be approved by a qualified engineer of the <br /> City's Engineering Division prior to the beginning of construction activities. <br /> The WQMP shall include the following BMPs along with selected BMPs to <br /> target pollutant removal: <br /> • Waste and materials storage and management BMPs (design and <br /> construction of outdoor materials storage areas and trash and <br /> waste storage areas, if any, to reduce pollutant introduction). <br /> • Spill prevention and control BMPs. <br /> • Slope protection BMPs. <br /> • Water efficient irrigation practices. <br /> • Permanent erosion and sediment controls (e.g., hydroseeding, <br /> mulching, surface covers). <br /> Projects within the Project Area will be required to comply with the <br /> applicable provisions C3.c of MRP, including Low Impact Development <br /> (LID) source control, site design, and stormwater treatment if applicable. <br /> The WQMP shall not include infiltration BMPs unless they comply with <br /> design guidelines and requirements specified in TC -1: Infiltration Basins in <br /> the CASQA Stormwater Quality BMPs Handbook for New Development and <br /> Significant Redevelopment (2003) and /or are specifically approved by the <br /> City Engineer and shall meet MRP - NPDES Permit minimum requirements <br /> including adequate maintenance and that the vertical distance from the <br /> base of any infiltration device to the seasonal high groundwater mark shall <br /> be at least 10 feet. <br /> 21. Water Supply. Prior to tentative map approval for the Staples Ranch Site, <br /> sufficient water supply for the Staples Ranch Site must be verified by the <br /> City of Pleasanton as described in EIR mitigation measure WS -1.1. The <br /> water supply verification must include documentation of historical water <br /> deliveries for the previous 20 years, as well as a description of reasonably <br /> foreseeable impacts of the proposed subdivision on the availability of water <br /> resources of the region. <br /> Conditions of Approval /PUD -68 <br /> Appendix Conditions 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.