My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
092110
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 12:36:41 PM
Creation date
9/15/2010 12:30:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I -580 AT FOOTHILL ROAD IMPROVEMENTS — PHASE 1 AND 2 <br />r J <br />• \ Jc \ t. ?' t <br />' mo <br />• `V�,� 7�.� • <br />. '�, <br />� <br />-di+ <br />' ROJECT DESCRIPTION: This project will include phases 1 and 2 to improve the 1 -580 <br />ntersection at Foothill Road for the purpose of improving intersection operations and safety. <br />ROJECT JUSTIFICATION: The project will modify the interchange by replacing the direct EB <br />o SB and EB to NB "loop" connections with a "T" style intersection at Foothill Road just south of <br />he I -580 interchange. The intersection would be signalized, significantly improving interchange <br />afety by removing two problematic weaving locations caused by the existing connections. The off - <br />amp would terminate at Foothill Road and include EB left and right turns off the freeway. The <br />project would also relieve weaving concerns at the intersection of Foothill Road and Canyon Way. <br />'hase 1 requires a Project Study Report to establish a project scope and cost estimate. Phase 2 will <br />omplete project plans, specifications and cost estimates. Phase 2 should be completed by mid 2010. <br />hase 3 will construct the project. The project will be funded through TVTC fees. <br />PROJECT COST ESTIMATE <br />Item <br />Cost <br />Funding Source <br />Total <br />1 @ Foothill Rd. Imp. Phase 1 <br />$50,000 <br />TVTC fees <br />$200,000 <br />1-580 @ Foothill Rd. Imp. Phase 2 <br />$150,000 <br />TOTAL <br />$200,000 <br />$200,000 <br />CIP #: 095034 CATEGORY: Streets RECOMMENDATION: Fund in FY 2009 -10 <br />ATTACHMENT 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.