Laserfiche WebLink
ATTACHMENT 1 <br />DRAFT REVISIONS TO THE DRAFT <br />PUD CONDITIONS OF APPROVAL FOR PUD -68 <br />(CONTINUING LIFE COMMUNITIES) <br />Attachment 1 <br />All proposed modifications are shown in Track Changes. <br />1. Construction Hours <br />Staff recommends draft condition of approval II.B.5 of the Appendix for Case <br />PUD -68 be modified as follows: <br />Construction Noise —Best Management Practices. The project developer <br />shall implement construction best management practices, including the following, <br />to reduce construction noise: <br />a. Locate stationary construction equipment as far from adjacent <br />occupied buildings as possible. <br />b. Select routes for movement of construction related vehicles and <br />equipment so that noise sensitive areas, including residences, and <br />outdoor recreation areas, are avoided as much as possible. Include <br />these routes in materials submitted to the City of Pleasanton for <br />approval prior to the issuance of building permits. <br />c. All site improvements and construction activities, except site grading, <br />shall be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday <br />through Saturday. Site grading_shall be limited to the hours of 8:00 <br />a.m. to 5:00 p.m. Monday through Friday. In addition, no <br />construction shall be allowed on State and federal holidays. If <br />complaints are received regarding the Saturday construction hours, <br />the Director of Community Development may modify or revoke the <br />Saturday construction hours. The Director of Community <br />Development may allow earlier "start times" for specific construction <br />activities (e.g., concrete foundation /floor pouring), if it can be <br />demonstrated to the satisfaction of the Director of Community <br />Development that the construction and construction traffic noise will <br />not affect nearby residents. <br />d. All construction equipment must meet Department of Motor Vehicle <br />(DMV) noise standards and shall be equipped with muffling devices. <br />e. Prior to construction, the applicant shall post on the site the allowable <br />hours of construction activity. <br />f. The property owner shall designate a noise disturbance coordinator <br />who will be responsible for responding to complaints about noise <br />during construction. The telephone number of the noise disturbance <br />Page 1 of 4 <br />