Laserfiche WebLink
PIh / I ir=inrcr, - h urA /Imp, ,unl ( n't / •tiurare BKF Engineers <br /> Bernal at I -680 Interchange PUP Proire 4670 Willow Road. Suite 250 <br /> City of Pleasanton Pleasanton, CA 94588 <br /> 925.396 (tM1. 925.396 7799 Pax) <br /> PM II - BKF Subtask Breakdown August 6, 2010 <br /> rape nage c ues, u mina ogs mores, reports, <br /> 1.1 Minutes, Agendas, Joint Resolution Reports ,etc. 4 8 8 20 <br /> 1.2 Coordinate Design with Team Members and Consultants 4 8 12 <br /> 1.3 Ccomfinate Meetings with Callas. City and Stakeholder 4 8 12 <br /> Total Hours (Per Tak)_ 12 24 0 0 0 0 0 a 0 44 <br /> ask 2 Preliminary Engineering. Investigations, 1 Environmental Documentation <br /> - ubtael Subtask Description <br /> 2.1 - repare a trans ncroac mint - ern •• nation 2 2 <br /> 2.2 ColIecURevtew Data (Repoli', As-bullts, R/W Record Mapping) 2 4 8 <br /> 2.3 Collect/Map Utility Record Information 2 2 2 8 14 <br /> 2.4 Conduct Site Investigations 2 2 2 2 8 <br /> 2.5 Conduct Survey Control and Supplemental Topographic Survey 4 32 32 68 <br /> 2.6 Prepare Base Sheet Mapping with Supplemental Topo Survey 2 4 32 38 <br /> Total Hours (Per Task, 2 10 8 42 2 2 40 0 32 136 <br /> 3.1 nput tng way gnnients as on - u 2 4 8 <br /> 3.2 Refine Existing Alignment Based on Field Observations/Survey 2 4 6 <br /> 3.3 Develop Profaned Alternative Geometries 4 _ 4 20 12 4 44 <br /> 3.4 Identify Non-Standard Design Features 2 4 4 10 <br /> 3.5 Prepare Geometilc Exhibit Plans and DIG 78 8 8 <br /> 3.8 Meet with Cakrans Design Regarding Nonstandard Features 4 4 4 12 <br /> 3.7 Prepare Mandatory/AdvisoryFact Shaer Exception Reports 4 24 8 8 8 8 80 <br /> Prepare Pudic Outreach Meeting Supportive Information/Exhibits and <br /> 3.8 Present 4 4 a <br /> Total Hours (Per Task) 12 r 22 28 40 20 16 18 0 0 154 <br /> 4.1 ncoiparate elms on omments as Hew 2 4 8 14 <br /> 4.2 Prepare Title Sheet 2 2 4 6 <br /> 4.3 Prepare Layout Sheets 2 4 4 18 8 8 4 48 <br /> 4.4 Prepare Typical Cross Section Sheets 4 8 4 4 8 28 <br /> 4.5 Prepare Profile Sheets 4 8 4 16 <br /> 4.6 Prepare Utility Relocalbn/Occupation Plans 2 4 4 10 <br /> 4.7 Prepare Retaining Well Layout Sheets (As Required) 4 16 8 8 36 <br /> 4.8 Prepare Stage Construction/Traffic Handling Plana 2 8 a 8 26 <br /> 4.9 Prepare Pavement Delineation and R• ing Sheets 4 8 4 16 <br /> 4.10 Prepare Electrical/Signal Modification heats 18 24 16 16 72 <br /> 4.11 Prepare Preliminary Drainage Cakulaliona 4 8 4 4 20 <br /> 4.12 Prepare Draft Stone Water Data Report 2 16 18 <br /> 4.13 Complete PEER Documentation/Forma 2 4 4 10 <br /> 4.14 Prepare Engineers Estimate 2 4 4 4 14 <br /> 4.15 Compile (Unedited) Standard Special Provisions (SSPs) 2 8 4 14 <br /> 4.16 Conduct ONDC Review 16 18 <br /> Total Hours (Per Task) 12 78 28 116 38 38 48 6 0 384 <br /> ask 5 100% PS&E Submittal <br /> ubtasl Subtask Description <br /> 5.1 ncorporate • mints • ity - trans • . 'mien 4 4 4 4 4 20 <br /> 5.2 Update Previously Prepared Sheets with Design Revisions 8 4 4 10 32 <br /> 5.3 Prepare Construction Detail and Grading Sheets 2 4 4 4 14 <br /> 5.4 Prepare Erosion Control and Water Pollution Control Sheets 2 8 4 6 22 <br /> 5.5 Prepare Drain.. Plan, Profile and Detail Sheets (Ax required) 2 4 4 8 18 <br /> 5.6 Update Stone Water Data Report 2 8 10 <br /> 5.7 Update PEER Documentation/Forms 2 2 4 <br /> 5.8 Update Engineers Estimate 2 6 4 4 4 22 <br /> 5.9 E04 Standard Special Provisions (SSPS) 8 18 8 32 <br /> 5.10 Conduct ONOC Renew 18 16 <br /> Total Hours (Per Task) 6 24 16 80 24 12 40 8 0 190 <br /> 6.1 ncorporat omments f rom it a rans e view 4 4 4 4 _ 4 20 <br /> 6.2 Update All Project Sheets 2 _ 16 4 4 10 42 <br /> 8.3 Finalize Storm Water Data Report 2 4 6 <br /> 6.4 Finalize PEER Documentation /Forma 2 2 _ - 4 <br /> 6.5 Finalize Engineer's Estimate 2 _ 4 2 2 4 14 <br /> 6.8 Finalize Specifications 2 4 12 18 <br /> 6.7 Conduct UNIX, Review 8 8 <br /> Total Hours (Per Task) 8 16 8 40 10 10 20 0 0 112 <br />