Laserfiche WebLink
PART B <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2010 -2011 <br /> LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993 -2, BONDE RANCH <br /> CITY OF PLEASANTON <br /> A. Intensely Landscaped Areas (maintenance): <br /> 1. Independence Drive (107,400 sq. ft.) <br /> 2. Livingston Way (20,500 sq. ft.) <br /> total area 127,900 sq. ft $7,838.00 <br /> B. Water $3,412.00 <br /> C. Power <br /> 1. Five Irrigation Controllers $540.00 <br /> D. Fuel Transition Zone (Firebreak) 287,000 sq. ft. <br /> 1. Weed Abatement $7,500.00 <br /> 2. Fence Repair $2,500.00 <br /> E. Street Lights <br /> 1. Re- lamping $540.00 <br /> F. Reserve /Long -Term Replacement Fund for scheduled long -term <br /> replacement of various district improvements (see note). $2,419.73 <br /> G. City of Pleasanton Administration $1,300.00 <br /> SUBTOTAL $26,049.73 <br /> County Fees for Collection of Assessments $439.62 <br /> GRAND TOTAL $26,489.35 <br /> Assessment per Unit (102 units) @ $257.22 per year <br /> 1 unit @ $252.91 (City parcel) <br /> Note: <br /> An existing surplus of approximately $30,000 exists for Lighting and Landscape Maintenance <br /> District 1993 -2, Bonde Ranch. These funds are held in an interest bearing account until needed <br /> for repairs to the landscaping, irrigation systems, fencing or other District features. <br /> 4 <br />