Laserfiche WebLink
ARTICLE 2. <br /> DEVELOPMENT OF THE PROPERTY <br /> 2.1 In General. City shall have the right to control development of the Property and <br /> Property Owner shall have the right to develop the Property in accordance with the provisions of <br /> the Project Approvals. <br /> 2.2 permitted Uses and Development Rights: Existing Standards. <br /> (a) The Property Owner shall be vested with the right to develop the Property <br /> in accordance with and subject to the terms and conditions of the Project Approvals. <br /> Specifically, without limiting the generality of Section 2.1 above, the permitted uses, density and <br /> intensity of use, height and size of buildings, provisions for reservation and dedication of land <br /> for public purposes and other standards and conditions of development shall be as set forth in the <br /> Existing Standards and the Project Approvals, including any exceptions to the Existing <br /> Standards, as described in Section 2.2(b) below. <br /> (b) The City (including individual departments thereof) has in effect at the <br /> Effective Date certain ordinances, laws, rules, regulations, development standards and policies <br /> applying to development of property within the City (the "Existing Standards In connection <br /> with the Initial Project Approvals, City has approved certain development plan elements or <br /> features that will apply to all phases of development of the Property, some of which have been <br /> authorized as exceptions to the City's Existing Standards. Such exceptions are specifically <br /> allowed to be granted pursuant to the City's planned development zoning regulations. Property <br /> Owner shall be vested with the right to develop the Property in accordance with the Project <br /> Approvals, and to the extent there is a conflict between the Project Approvals and the Existing <br /> Standards, the terms and conditions of the Project Approvals shall control. In addition, to the <br /> extent there is a conflict between the Specific Plan, the PUD and this Agreement, the provisions <br /> of this Agreement shall control. Notwithstanding the foregoing, nothing in this Agreement shall <br /> preclude City from applying changes occurring from time to time in the "Uniform Codes," e.g., <br /> the Uniform Building Code, Uniform Electrical Code, Uniform Fire Code, Uniform Mechanical <br /> Code, or Uniform Plumbing Code, provided that such changes (i) are found by City to be <br /> necessary to the health or safety of the citizens of City, and (ii) are generally applicable to all <br /> similar types of property in City. <br /> (c) To the extent there is any conflict, direct or indirect, between any Project <br /> Approval, including any condition to any Project Approval, and any CEQA mitigation <br /> measure(s) adopted by City in connection with any Project Approval. the provisions of the <br /> Project Approval shall control. <br /> 2.3 Development Timing. Except as otherwise expressly provided in the Project <br /> Approvals, Property Owner shall not be required to follow any phasing plan or schedule in <br /> developing the Property. The City may control the timing of construction of the residential uses <br /> within the Project through limitations on issuance of building permits for such uses, consistent <br /> with the Growth Management Agreement. Other than as provided in the Growth Management <br /> Agreement or the Project Approvals, Property Owner shall be able to initiate development of the <br /> 35690/849375v 14 5 0825/00 <br />