My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
072010
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 12:13:16 PM
Creation date
7/14/2010 12:13:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/20/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> d. Waste Reduction, Recycling, and Composting <br /> Building on waste reduction programs already in place within the City, develop an <br /> overall set of goals and strategies for reducing waste and its impact on the climate. <br /> These may include new efforts to reduce waste at the source, reduce packaging, and <br /> improve the performance of the City's existing recycling and composting collection <br /> programs. <br /> e. Adaptation Measures <br /> Develop specific recommendations regarding water conservation, flood protection, <br /> and maintenance of urban forests and wetlands that serve the dual purpose of <br /> adaptation and carbon sequestration, such as green roofs and tree planting to retain <br /> water and reduce heat islands. <br /> B4. Community Engagement <br /> a. Develop Community Engagement Plan and Project Web Site <br /> Develop and launch a multi- faceted approach to community engagement involving <br /> print and interactive media, including an interactive project website that supports <br /> the engagement effort <br /> b. Prepare and Hold Public Workshops for Residents and Businesses <br /> Prepare, direct, and hold three public workshops to present the CAP outline and <br /> draft conservation /GHG reduction measures. Gather input and ideas, and identify <br /> issues related to the CAP. <br /> B5. Prepare Climate Action Plan <br /> a. Administrative Draft CAP <br /> Prepare and submit an Administrative Draft of the full CAP, including a program <br /> for monitoring the effectiveness of programs and policies, for review and comment <br /> by City staff. Deliverable 10 printed copies plus electronic version. <br /> b. Public Draft CAP <br /> Revise the Administrative Draft, and then prepare the Public Draft CAP for public <br /> and City Council review. Collect public comments sent through email, the project <br /> web site, and possibly other City channels. Work with the City to address all <br /> comments by the public and by the City Council. Deliverable 10 printed copies <br /> plus electronic version. <br /> c. Complete Final Climate Action Plan <br /> At the conclusion of the public comment period, assemble all written and oral <br /> comments, summarizing issues raised in the comments and how these issues are <br /> addressed in the revised (Final) CAP. Revise the Draft CAP to incorporate <br /> 4 <br /> July 8, 2010 Revised Scope: Pleasanton Climate Action Plan; <br /> General Plan Update and Housing Element Environmental Documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.