My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility Timing Signature <br /> related PM impacts to this intersection, the following lane configurations and, to the extent so permits. <br /> and modifications are recommended: provided in the Title <br /> development <br /> agreement, the City of Date <br /> Northbound leg 2 left -turn lanes, 3 through- lanes, and 1 Pleasanton. <br /> right -turn lane <br /> Southbound leg 3 Left -turn lanes, 3 through- lanes, and 1 Collection: <br /> free right -turn lane City of Pleasanton <br /> Building and Safety or <br /> Eastbound leg 2 left -turn lanes, 2 through lanes, 1 right- Engineering Division. <br /> turn lane <br /> Westbound leg 2 left -turn lanes, 2 through- lanes, 1 free Implementation: City <br /> right -turn lane of Pleasanton, <br /> Engineering Division. <br /> Remove eastbound and westbound signalized splits <br /> Narrow lanes to reduce the total distance pedestrians are <br /> required to cross to 80 feet <br /> This mitigation would improve the PM operations from LOS F to LOS D. <br /> These improvements are included as projects in the City's Traffic <br /> Development Fee. The project developers shall pay the traffic fees to <br /> address this mitigation. <br /> TR -1.3 Improve Hopyard Road at Stoneridge Drive #11). To reduce Verify payment of Funding: Project Prior to issuance <br /> project related PM impacts to this intersection, the proposed mitigation is traffic development fee developers and, to the of building Signature <br /> and that intersection extent so provided in permits (as to the <br /> signal retiming with a cycle length of 100 seconds in the PM and a improvements have the development payment of traffic Title <br /> required eastbound free right turn. Implementing this mitigation would been implemented. agreement, the City of development <br /> improve PM operations from LOS F to LOS D. Pleasanton. fees); as Date <br /> determined by the <br /> Collection: City of City of Pleasanton <br /> The eastbound free right turn lane is a project in the City's Traffic Pleasanton, Building as to construction <br /> Development Fee. The project developers will pay the traffic and Safety Division. of the <br /> development fee as mitigation. improvements and <br /> Implementation and signal retiming. <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.