Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility Timing Signature <br /> Field inspections: City <br /> of Pleasanton <br /> Engineering Division. <br /> S- NO -1.1 Repave Stoneridge Drive between Kamp Drive and Trevor Verify that Stoneridge Payment of funds for Prior to Signature <br /> Drive between Kamp the repaving: Project completion of <br /> Parkway with noise attenuating pavement and replace sound wall nearest and Trevor is repaved Sponsor to the Stoneridge Drive Title <br /> the Stoneridge Drive bridge Prior to the completion of the Stoneridge with noise attenuating maximum amount extension to El <br /> Drive extension to El Charro Road, Stoneridge Drive between Kamp pavement and that the ($1.5 million) as set Charro Road. Date <br /> Drive and Trevor Parkway shall be repaved with noise attenuating sound wall adjacent to forth in the Specific <br /> pavement and the sound wall closest to the south side of the Stoneridge the two homes on Plan Amendment; any <br /> Maria/Curry closest to amount above that, the <br /> Drive bridge (adjacent to the Maria /Curry Street residences) shall be the bridge is replaced City of Pleasanton. <br /> replaced with a wall approximately one foot higher or, if the residents do with a wall one foot <br /> not want their wall replaced, by constructing a new, higher wall on City higher than the existing Implementation: <br /> right of way in front of the existing wall. wall. Project Sponsor for <br /> the construction of the <br /> sound wall; the City of <br /> Pleasanton for the <br /> repaving. <br /> Field inspections: <br /> City of Pleasanton <br /> Engineering Division. <br /> Population and Housing <br /> PH -1.1 Deleted per FEIR. The Development Agreement for the Project <br /> will establish the phasing requirements for the senior continuing care <br /> community. See FEIR, pages 4 -21, 4 -22. <br /> Transportation <br /> TR -1.1 Deleted —Per FEIR, at page 3 -22. Impact less than significant with <br /> extension of Stoneridge Drive. <br /> TR -1.2 Improve Hopyard Road at Owens Drive #10). To reduce project- Verify payment of Payment of fee: Prior to issuance <br /> traffic development fee. Project Developers of building Signature <br /> 31 <br />