Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility''"' Timing Signature <br /> Engineer prior to the beginning of occupancy. <br /> HY -3.1 Maintain the detention basin. The City shall be responsible for Assure the operation Monitoring: City of On- going. <br /> assuring the operation and maintenance of the on -site detention basin and and maintenance of the Pleasanton Signature <br /> onsite detention basin Engineering Division. <br /> performance goals. Performance goals will include regular system and performance goals. Title <br /> inspections, maintenance when necessary, technical training of staff, and Implementation: City <br /> funding mechanisms to support continued effective operation and of Pleasanton. Date <br /> maintenance of the detention basin. <br /> HY -4.1 Obtain FEMA flood hazard areas updates prior to construction. Verify that a Verification: City of Prior to <br /> Conditional Letter of Pleasanton construction Signature <br /> Prior to beginning any construction activities, a Conditional Letter of Map <br /> Map Revision is Engineering Division. activities. <br /> Revision shall be obtained from FEMA for the Livermore Flood obtained from FEMA. Title <br /> Protection Improvements. This letter would not revise an effective Implementation: <br /> National Flood Insurance Program map; but it would indicate whether the Project Sponsor. Date <br /> project, if built as proposed, would or would not be removed from the <br /> Special Flood Hazard Area defined by FEMA if it is later submitted as a <br /> request for a Letter of Map Revision. Livermore Flood Protection <br /> Improvements shall incorporate FEMA recommended design changes <br /> issued with the Conditional Letter of Map Revision. <br /> HY -4.2 Implement Livermore Flood Protection Improvements. Prior to Verify that Livermore Verification: City of Prior to issuing <br /> issuing the certificate(s) of occupancy, the Livermore Flood Protection flood protection Pleasanton the certificate(s) Signature <br /> improvements are Engineering Division. of occupancy. <br /> Improvements shall be implemented as part of the El Charro Specific completed; an Title <br /> Plan. This program would include construction of regional stormwater application for a Letter Implementation: City <br /> detention/retention facilities east of El Charro Road as specified in the of Map Revision to of Livermore or Date <br /> El Charro Specific Plan and construction of the north overbank channel to reflect both the new Project Sponsor. <br /> facility and <br /> redirect spills from the Arroyo las Positas that spill over El Charro Road <br /> improvements to the <br /> onto the northern portion of the Staples Ranch development site during a Arroyo Mocho is <br /> flood event. The Livermore Flood Protection Improvements shall be submitted to FEMA. <br /> 23 <br />