My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> seasonal high groundwater mark shall be at least 10 feet. <br /> Each individual developer shall be responsible for implementation and <br /> maintenance of BMPs. A BMP Monitoring and Maintenance Plan shall <br /> be incorporated as part of the WQMP and shall include, at a minimum, <br /> annual inspection and maintenance of all structural BMPs on the property, <br /> a report of non structural BMP inspection and compliance, and reporting <br /> requirements. The Monitoring and Maintenance Plan must be approved <br /> by the City of Pleasanton City Engineer prior to the beginning of <br /> occupancy. The Monitoring and Maintenance Plan can be administered <br /> through lease agreements assigning responsibility to the occupants, <br /> through the creation of a Community Services Authority (CSA) or by <br /> other means as approved by the City. If property titles are transferred, the <br /> new owner shall be responsible for their respective portion of the plan. <br /> HY- 1.2 Implement an Integrated Pest Management Plan and Pesticide Verify that an Verification: City of Verification: Prior <br /> Management Program. An Integrated Pest Management Plan shall be integrated Pest Pleasanton to occupancy Signature <br /> Management Plan is Engineering Division. permit. <br /> prepared by each project developer and for the City parks on the Staples prepared and Implementation: Title <br /> Ranch site, and implemented to minimize the risk of pollutants associated implemented; field Project Developers <br /> with landscape establishment and maintenance practices in surface water inspections. and Property Owners. Date <br /> runoff and infiltration to groundwater. All Integrated Pest Management <br /> Plan guidelines shall comply with California Department of Pesticide Field inspections: City Field inspections: <br /> of Pleasanton On -going as <br /> Regulation and Alameda County Agricultural Commissioner rules and Engineering Division. required by Pest <br /> regulations in regards to pesticide storage, use, transportation, reporting, Management Plan. <br /> and safety. The plan shall encourage minimization and efficiency of <br /> chemical and fertilizer use. Because the receiving water have been listed <br /> as impaired by diazinon, diazinon use shall also be severely limited or <br /> prohibited. <br /> Each property owner shall be responsible for implementation of the <br /> Integrated Pest Management Plan. The plan must be approved by the City <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.