My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility''"'"'''" Timing Signature <br /> the location of the natural gas pipeline using highly visible <br /> markers that will remain in place throughout project <br /> construction in the vicinity of the pipeline and ensure that all <br /> construction workers are aware of the location of the line. <br /> The location of the pipeline shall be noted on the site and <br /> construction plans. Further, the project contractor shall take <br /> all appropriate measures necessary to ensure that the line is <br /> not disturbed. <br /> c. The project developers shall develop an emergency response <br /> plan prior to construction that will include response <br /> measures in the event that there is disturbance of any <br /> underground utilities. The plan will be subject to review and <br /> approval by the City. <br /> Hydrology and Water Quality <br /> HY -1.1 Implement Water Quality Management Plan with Targeted Verify that a site- Verification: City of Prior to <br /> Pollutant Removal Rates. In accordance with the applicable provisions of specific Water Quality Pleasanton construction Signature <br /> Management Plan is Engineering Division. activities. <br /> the Municipal Regional Permit (MRP)- NPDES Permit, implementation prepared and Title <br /> of and compliance with the stormwater quality BMPs are required. implemented; field Implementation: Monitoring: <br /> However, to ensure that implemented BMPs are effective for reducing inspections. Project Developers. On- going. Date <br /> potential pollutant loads to a sufficient level of protection, each project <br /> developer shall prepare and implement a site specific Water Quality Field inspections: <br /> Engineering Division. <br /> Management Plan (WQMP) with BMPs targeted to reduce post <br /> construction pollutants listed in Table 3.5 -5. <br /> This WQMP shall identify specific stormwater BMPs for reducing <br /> potential pollutants in stormwater runoff. BMPs shall be selected to target <br /> pollutants listed in Table 3.5 -5; selection criteria and documentation shall <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.