Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> Hazards and Hazardous Materials <br /> HZ-2. l Prevent disruption of on -site utilities. The project developer(s) Verify that the Verification: City of Prior to <br /> shall implement the following measures: Underground Service Pleasanton Building construction Signature <br /> Alert is contacted; and Safety Division. activities. <br /> PG &E gas lines are Title <br /> a. Prior to initiation of any on -site construction activities, the identified and Implementation: <br /> project developer shall contact the Underground Service demarcated; an Project Developers. Date <br /> Alert (USA) whose purpose is to receive planned excavation emergency response <br /> reports from public and private excavators and to transmit plan for disturbance of Field inspections: City <br /> those planned excavation reports to all participating underground utilities is of Pleasanton Building <br /> prepared; field and Safety Division. <br /> members of USA who may have underground facilities at <br /> inspections. <br /> the location of excavation. The USA will contact local <br /> utilities and inform them that construction is about to begin <br /> in their service area. This notice allows local utilities to mark <br /> the areas where their underground facilities are located near <br /> the construction site so that they may be avoided during <br /> project construction. <br /> b. Prior to construction activities within 50 feet of the PG &E <br /> gas line, the project contractor shall identify and demarcate <br /> 19 <br />