Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> e. Contingency plans and appropriate remedial measures shall <br /> also be outlined in the revegetation plan should the plantings <br /> fail to meet designated success criteria and planting goals. <br /> BIO -7.1 Provide compensation for impacts to jurisdictional waters. If the Verify that the US Verification: City of Prior to <br /> Corps or SFRWQCB requires mitigation for impacts to waters of the U.S. Army Corps of Pleasanton construction Signature <br /> Engineers (Corps), Engineering Division. activities. <br /> or state associated with construction of the Stoneridge Drive bridge, then California Department Title <br /> the Project Sponsor shall compensate for the loss of the affected area to of Fish and Game Implementation: <br /> ensure no net loss of habitat function and values occurs. Compensation (CDFG), and/or San Project Sponsor; for Date <br /> shall be provided at a minimum of 1:1 ratio; however, the actual ratio Francisco Regional potential <br /> Water Quality Control pedestrian/bike bridge, <br /> shall be determined after consultation with the Corps, CDFG, and/or Board (SFRWQCB) are City of Pleasanton. <br /> SFRWQCB during the permitting process. consulted and affected <br /> habitat is compensated Endnotes #5 and #6 <br /> at a ratio determined apply. <br /> during the consultation; <br /> field inspections. Field inspections: City <br /> of Pleasanton <br /> Engineering Division. <br /> BIO -8.1 Minimize lighting spillover. All outdoor lighting shall be Verify that all outdoor Verification: City of Verification: Prior <br /> equipped with devices that will direct lighting away from the Arroyo lighting is directed Pleasanton to the issuance of Signature <br /> away from the Arroyo Community a building permit. <br /> Mocho and outdoor lighting within 200 feet of the centerline of the arroyo Mocho; field Development Title <br /> shall be of the minimum wattage required for the particular use and shall inspections. Department. <br /> be shielded and directed away from the corridor to the specific location Date <br /> intended for illumination (e.g., roads, walkways, or recreation fields) to Implementation: <br /> Each Project <br /> prevent stray light spillover onto sensitive habitat. Developer for its PUD <br /> site within 200 feet of <br /> Arroyo centerline; <br /> Project Sponsor for <br /> the bridge and all <br /> other construction <br /> activities to be <br /> 16 <br />