Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> Field inspections: <br /> City of Pleasanton <br /> Building and Safety <br /> Division or <br /> Engineering Division. <br /> B10 -6.1 Obtain Streambed Alteration Agreement. The Project Sponsor or Verify that a Section Verification: City of Prior to any <br /> project developer shall obtain a Section 1600 Streambed Alteration 1600 Streambed Pleasanton construction Signature <br /> Alteration Agreement Community activities that may <br /> Agreement from the CDFG prior to any construction activities that may was obtained from the Development result in any Title <br /> result in any disturbance to stream corridors, including riparian CDFG. Department. disturbance to <br /> vegetation. Specific mitigation measures shall be developed during Implementation: stream corridors, Date <br /> consultation with the CDFG, but may include measures such as diverting Project Sponsor; for including riparian <br /> stream flow around the construction site, using bridges instead of culverts, potential vegetation. <br /> pedestrian/bike bridge, <br /> erosion control and bank stabilization measures, and restoring stream City of Pleasanton. <br /> corridor habitat damaged from project construction. <br /> Endnotes #5 and #6 <br /> apply. <br /> B10 -6.2 Erect exclusion fencing around spearscale mitigation area. Prior Verify that exclusion Verification: Prior to <br /> to construction along the banks of the Arroyo Mocho, the project fencing is erected City of Pleasanton construction along Signature <br /> around spearscale Engineering Division. the banks of the <br /> developer shall ensure that construction crews erect an exclusion fence mitigation area; field Arroyo Mocho. Title <br /> around the spearscale mitigation area on the north bank of the arroyo to inspections. Implementation: <br /> reduce the potential of impacts to the species. The fence shall be orange Project Sponsor; for Date <br /> plastic construction fencing, four feet in height, placed around the plant potential <br /> areas that are going to be protected during construction of the bridge. pedestrian bike bridge, <br /> City of Pleasanton. <br /> Endnotes #5 and #6 <br /> apply. <br /> Field inspections: <br /> City of Pleasanton <br /> Engineering Division. <br /> 14 <br />