My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
060110
>
15 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 5:25:48 PM
Creation date
5/26/2010 5:12:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/1/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 14: A "Stepped" House Designed Within a Slope Plane. <br />The building designs for these lots will be controlled by design guidelines. As conditioned, <br />computer generated view studies will be provided with the lot- specific design plans where <br />the visual impacts of the homes will be evaluated for location, form, and massing and <br />where, if necessary, the structure can then be modified. Copies of these analyses with the <br />design plans and conditions will be forwarded to the Planning Commission. <br />The Foothill Road Corridor Overlay District provides flexibility under Section 18.78.050, <br />below: <br />The reviewing boards, commissions and officials may approve projects which <br />do not comply with strict technical standards of this chapter upon making a finding <br />that the design of the project as a whole is consistent with the highly aesthetic, rural <br />character of the Foothill Road corridor." <br />Staff considers the sloping plane method of measuring building height to be consistent with <br />the rural character of the Foothill Road corridor. <br />Green Building Measures <br />The minimum City standard for new single family homes is 50 LEED points with a <br />minimum of 10 points in each category (Resources, Energy, and IAQ/ Health). The homes <br />of this project are required to achieve a minimum 100 green points. The green building <br />program for these homes would be submitted with the design applications. <br />View Analyses <br />Exhibit F are the view analyses of the previous six -lot development are attached showing <br />the before /after views of the six -lot project from various vantage points. The Planning <br />Commission reviewed the analyses but did not comment. <br />Item 6.b., PUD- 87- 19 -03M <br />Page 26 of 37 April 28, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.