My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
060110
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 4:53:06 PM
Creation date
5/26/2010 4:53:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/1/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Routine and Preventative maintenance does not include, poles, arms, bases or <br /> underground wiring, which will be done on an as- needed basis either by proposal from the <br /> contractor or by work order from the City. <br /> 1.2 Preventative Maintenance <br /> In general, Preventative Maintenance consists of the bulk re- lamping of the entire <br /> City of Pleasanton Street Lights and Pathway Lights on a four year cycle. One quarter of the <br /> City of Pleasanton Street Lights and Pathway Lights shall be replaced by quadrant on an <br /> annual basis. <br /> Contractor shall provide a map of the City that identifies the quadrant and roadways <br /> where the lights will be relamped. <br /> 1.3 Night Checks <br /> The Contractor shall perform night checks on major arterials on an annual basis. The <br /> Contractor shall provide personnel equipped for night time detection of inoperative lights. <br /> Under this per light per month contract no additional payment will be made for the annual <br /> arterial night checks. These roadways include: Foothill Road, Hopyard Road. Santa Rita <br /> Road, Stoneridge Drive, West Las Positas Boulevard, Valley Avenue, Vineyard Avenue, <br /> Bernal Avenue, Owens Drive, Hacienda Drive, Stanley Boulevard, First Street and Sunol <br /> Boulevard. <br /> 1.4 Contact Number <br /> The contractor shall provide to the City a phone number and email address, and all <br /> calls will be phoned or emailed to the contractor directly. The phone number must be a toll <br /> free (800 -type) number and the number will be available 24 hours a day, 365 days a year. If <br /> calls are forwarded to or provided to the contractor it will be considered a "Service Request <br /> When notified by the City, either by mail, email, telephone, or Fax, the Contractor shall <br /> respond to the Service Request within 48 hours. Contractor must have compatible software <br /> in order to be able to accept electronic work orders through the City's Maintenance <br /> Management System. <br /> 1.5 Documentation <br /> The contractor will furnish complete documentation pertaining to lights worked on by <br /> the contractor during the last pay period. These will be filled out by the Contractor on a <br /> monthly basis and contain at a minimum when the service call was received by Contractor, <br /> person making the call, the pole number of the light worked on, the address or location of the <br /> pole and what was wrong with the light. The report shall also identify any lights that <br /> required one or more return service calls to complete the repair and restore proper operation <br /> Street Light and Pathway Light Maintenance Contract Contract No. <br /> Attachment 2 Scope of Work Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.