My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
051810
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2010 12:17:31 PM
Creation date
5/13/2010 12:17:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/18/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> CONDITIONS OF APPROVAL <br /> PUD- 84- 21 -04M, Civic Square Apartment <br /> (Revised Project, Addition) <br /> 4800 Bernal Avenue <br /> May 4, 2010 <br /> Project Specific Conditions <br /> 1. The 36 -unit, 6- building addition and remodeling including site changes, landscaping, <br /> buildings, etc., covered by this approval shall be constructed substantially as shown on <br /> the development plans, Exhibit B, dated "Received, March 1, 2010," on file with the <br /> Planning Division, except as modified by the following conditions. Exhibit B for PUD -84- <br /> 21-04M includes: "Administration Clubhouse Building Floor Plans and Elevations'; <br /> "Apartment Building Floor Plans and Elevations"; "Focused Site, Landscaping, and Tree <br /> Removal Plans", "Overall Site Plan'; "Stormwater Management Plan and Details," and <br /> "Materials and Color Samples Minor changes to the plans may be allowed subject to <br /> the approval of the Director of Community Development. <br /> 2. All conditions of approval for this development plan shall be reprinted and included as a <br /> plan sheet(s) with the building permit plan check sets including grading, construction, <br /> and landscaping plans, which shall be kept on the project site at all times. The applicant <br /> may request these conditions of approval be attached to the plan set as a separate <br /> document which he /she is responsible for obtaining and ensuring the conditions are <br /> securely attached. Prior approval from the Planning Division is required before any <br /> changes are constituted in site design, grading, etc. It is the responsibility of the project <br /> developer to ensure that the project contractors are aware of, and abide by, the <br /> approved plans and all conditions of approval. <br /> 3. The clubhouse shall be constructed to include a roof mounted photovoltaic system <br /> utilizing integral roof panels. The solar water heating system for the new swimming pool <br /> shall be mounted on the roof area of the two -story or three -story buildings in the central <br /> project area. The construction details shall be shown on the building permit plans prior <br /> to the issuance of building permit. <br /> 4. The in -lieu park dedication fees shall be paid with each Building Permit, at the rate then <br /> in effect, unless this requirement has been otherwise satisfied. <br /> 5. The applicant shall work with the City Manager to determine the appropriate contribution <br /> to the Bernal Property Reserve Fund. <br /> 6. All proposed storm drain pipes shall be connected to the privately owned, storm drain <br /> system via a junction structure, i.e., manhole or inlet. The applicant may, at the <br /> discretion of the City Engineer, connect the new storm drains to the public 72 -inch storm <br /> drain line. The construction details shall be shown on the building permit plans prior to <br /> the issuance of building permit. <br /> 7. This project shall meet the minimum accessibility requirements of Chapter 11A Section <br /> 1103A.3.1 of the California Building Code for multi -story apartments in buildings with no <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.